Architectural, Construction, Engineering And Inspection Services – Technical Equipment Of The User Tbz. The Free State Of Bavaria Is Legally Obliged To Monitor Tunnels Longer Than 400M In A Permanently Manned Location. The Federal Autobahn Gmbh Is Currently Providing This Service For The Free State Of Bavaria In Accordance With Re Ing Part 3, For The Tunnels On Federal And State Roads As Well As Other Telematic Systems Until The Company Is Operational. Against This Background, A Newly Built Tunnel Operations Center (Tbz) In Bavaria Is To Take Over These Tasks In The Future. The Scope Of Services To Be Provided Here Extends In The First Phase To The Basic Determination And The Preliminary Planning For The Users Technical Equipment, Which Is Necessary For Monitoring The Tunnels. Depending On The Progress Of Construction, The Further Service Phases, From Draft Planning To Later Construction Supervision In Accordance With §53 Ff. Hoai, Will Be Commissioned In Stages. Throughout The Entire Project, Close Coordination With The Bavarian State Building Construction Department Is Required, Which In Parallel Carries Out The Planning And Construction Of The Building And System Groups 1 To 4 In Accordance With Section 53 Hoai. Costs And Scheduling Must Always Be Coordinated. First, A Comprehensive Inventory Of The Systems To Be Migrated To The Tbz Must Be Carried Out. Together With The Users Needs Planning And The Requirements For Availability Class 3 In Accordance With Din En 50600, These Principles Form The Foundation For The Services To Be Provided. Equipped With Six Workstations And Two Multifunctional Walls, The Operators Room Forms The Core Of The Building And Thus The Tunnel Monitoring. The Tunnel Monitoring Concept Must Be Refined With The Client, Including Determining And Dimensioning The Control Center Technology To Be Used. For Tunnel Monitoring, A Higher-Level Control System (Scada) Must Be Developed To Control The Tunnels And Video Systems, Based On An Existing Reference Project. An Operations Control System And A Ticket System Must Be Provided For The Emergency Handling Of Events In The Tunnel And For The Handling Of Troubleshooting With The Responsible Specialist Personnel Both In The Tunnel Headquarters And In The Tunnel Facilities Themselves. A Tunnel Simulator With Event Simulation Must Also Be Integrated. Furthermore, The Hardware And Software Components Required For The Operation Of The Tbz Must Be Determined, Including For The Administrator Workstations, The Office Rooms And The Technical Workshops. The Communication Infrastructure Must Be Planned In Lan And Wan Concepts For Connecting The Tunnels And Operating The Tbz. Two Variants Need To Be Developed For This. Based On These Circumstances, The Media Connections Such As Power, Signaling Technology, Cooling And Ventilation For The Technical Equipment Must Be Dimensioned And Handed Over To The State Building Construction Department For The Planning Of Their System Groups.
Contact Information
Address
Krelingstraße 50
Contact No.
+49 895434887850
Email
datenschutzbeauftragter@lbd.bayern.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114793816
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.