|
The Subject Of The Order Is The Execution Of The Task Entitled: Construction Of A Sanitary Sewage System (Dn 200) With Connections (Dn 160) And A Sewage Pumping Station In The Towns Of Stróża-Kolonia And Słodków Trzeci, Kraśnik Commune, Which Is Carried Out As Part Of The Public Procurement Procedure Entitled: Construction Of A Sanitary Sewage System (Dn 200) With Connections (Dn 160) And Sewage Pumping Station In The Towns Of Stróża-Kolonia And Słodków Trzeci In The Kraśnik Commune” The Subject Of The Order Includes In Particular The Construction Of: • A Gravity Sanitary Sewage System Pvc Solid Dn200x5.9 Mm With A Length Of Approx. Solid Pvc Sanitary Sewage System Dn160x4.7Mm, • Sewage Pumping Station In A Dn1200 Concrete Tank. The Planned Pvc Dn200 Sanitary Sewage Network Will Be Incorporated Into The Existing Pvc Dn200 Sanitary Sewage Network By Connecting It To The Existing Sewage Pumping Station On Plot No. 210/66. The Planned Pvc Dn200 Sanitary Sewage Network Will Be Completed In Plot 76, Point 32, Using A Pp Dn425 Well. The Following Network Slopes Have Been Designed In Sections: • Section 1-2 - 3.5% Decline, • Section 2-3 - 9.0% Decline, • Sections 3-4, 8-15 - 6.0% Decline, • Sections 4-5, 24-Sr - 3.0% Decline, • Section 5-6 - Decrease 8.0%, • Section 6-8 - Decrease 7.0%, • Section 15-16 - Decrease 5.0%, • Section 16-19 - Decrease 4.0%, • Section 19-21 - Decrease 1.0%, • Sections 21-22, P-32 - Decrease 0.5%, • Section 22-23 - Decrease 2.0%, • Section 23-24 - Slope 2.5%, • Discharge Section Sr-P - Slope -2.0%, Connect The Designed Network To The Designed Concrete Wells 2, 10, 20, P As A Tight Connection. Connect The Designed Network To Wells Made Of Pp Dn425 3-9, 11-19, 21-32 And The Sr Pp Dn625 Expansion Well, Make It Tight To The Dn200 Base Or Through An In Situ Insert. According To The Geotechnical Opinion, There Are Simple Ground And Water Conditions In The Investment Area, Which, Combined With A Simple Structure, Qualifies The Entire Structure, Which Is The Network With Connections, To Geotechnical Category Ii. Note: Existing Sanitary Sewage Tanks (Septic Tanks) Should Be Permanently Disconnected Or Liquidated. As Part Of The Construction Works, The Ordering Party Indicates The Estimated Number Of Connections, I.E.: 16 Pcs. The Indicated Number Of Connections May Change +(-) 5 Pcs. The List Of Plots On Which Sewage Connections To Residential Buildings Will Be Made Is Indicated In The Annex To The Swz. Note! Important Information In Its Offer, The Contractor Should Include The Reconstruction Of The Damaged Surface - Wearing Course - Of The Municipal Road In The Town Of Słodków Trzeci Throughout The Entire Section Of Construction Works. The Detailed Scope Of The Order Regarding The Implementation Of The Subject Of The Contract Is Specified In The Swz And The Documentation Attached To The Swz (Annex No. However, The Ordering Party Indicates That The Bills Of Quantities Are Only Of Auxiliary Nature For The Contractor And Do Not Constitute
|