|
1. The Subject Of The Order Is The Performance Of Construction Works As Part Of The Investment Task Titled: Painting The Rooms And Replacing The Carpet In The Conference Room At The 2Nd Zus Branch In Poznań.2. The Scope Of Work Includes In Particular: Preparatory Works: - Removing, Securing And Moving Furniture To Adjacent Rooms; - Disassembly And Reassembly Of Electrical Equipment (Including Sockets, Switches), Information And Warning Signs And Other Elements Of Wall Markings For The Duration Of The Works; - Securing Floors, Furniture And Equipment With Foil; - Securing File Storage Shelves With Foil (Black, Opaque Foil); - Moving And Removing Debris Construction And Removal Of Rubble Along With Disposal, Construction Works On Walls And Ceilings: - Scraping, Washing Off Old Paint; - Removal Of Protruding Elements, I.E. Unnecessary Nails, Glue Residues, Etc.; - Repair Of Cracks In Plaster On Walls And Ceilings By Reflecting Plaster Along The Cracks And Supplementing With Plaster Made Of Ready-Made Plaster Mixtures Reinforced With Fiberglass Mesh; - Plaster Single-Layer Plaster On Walls And Ceilings; - Priming Of Substrates With Primers; - Double Painting Of Walls With Latex Matte Paints Resistant To Wet Scrubbing, Class I-Ii - Communication In The Basement Ral 9002, Room Social And Medical Offices Ral 9010, Communication Ral 9003, Customer Service Room Ncs S 1005-G; - Double Painting Of Previously Painted Walls And Columns With Concrete Paint (Ral 9002 Color) - Two Painting Of Walls With Washable Matt Emulsion Paints (Other Rooms Ral 9010); - Two Painting Of A Section Of The Wall In The Conference Room With Paint For Projectors - Area 4 M X 2 M, White Color; - Double Painting Of The Ceiling With Washable Matte Emulsion Paints (Ral9003); Flooring And Carpeting Works In The Conference Room: - Measuring The Rooms Before Ordering The Material, - Dismantling Existing Carpets And Wall Strips; - Cleaning And Preparing The Surface For Floor Coverings (Mechanical Cleaning Of Old Floors, Vacuuming The Surface, Priming), - Making Screeds Corrective And Leveling Thin-Layer With Priming, - Delivery And Installation Of Glued Pvc Flooring (Homogeneous Pvc Floor Coverings, Abrasion Resistance Class T, Utility Classification 34/43, Flame Retardancy Classification Bfl-S1, Anti-Slip, Color Similar To Ral 7038); - Welding Of Carpets, - Delivery And Installation Of 12 Cm High Pvc Skirting Boards In Color Walls, - Filling The Gaps With Acrylic And Silicone At The Junction Of The Skirting Boards And The Floor/Wall, (After Cleaning And Preparing The Substrate); Utility Properties Of The Carpet: - Homogeneous Pvc Floor Covering Glued To The Substrate, - Anti-Slip, - Non-Absorbent, Washable, Scratch And Tarnish Resistant, - Abrasion Resistance Class, Group T, - Utility Classification 34/43, - Classification Flame Retardancy Min. Bfl-S1, - Carpet Color Similar To Ral 7038/ Ral 7036 (Contrast Of Min. 30 On The Lrv Scale In Relation To The Walls Should Be Maintained), - Wall
|