1. The Subject Of The Order Is One Place, Many Possibilities - Modernization And Additional Equipment Of The Village Hall In Lasocice. 2. The Scope Of Works To Be Performed Concerns: A) Adjusting The Existing Floor Level In The Boiler Room To The Level Of 0.00, B) Demolition Of The Chimney, C) Dismantling The Existing Heating Installation In The Boiler Room Along With The Devices, I.E. Pipelines, Solid Fuel Boiler With Automation, A Section Of The Smoke Duct (Boiler - Chimney Section), Open Vessel, Etc., D) Installation Of An 18 Kw Heat Pump With An Electric Heater 9 Kw, Accumulation Buffer Tank With A Capacity Of 250 L, Exchanger And Pump Set (Plate Exchanger With A Capacity Of 35 Kw With Two Circulation Pumps And Designed Fittings, E) Installation Of Photovoltaic Panels With A Total Peak Power Of 12.04 Kwp (Maximum Active Power 11.0 Kw) Along With The Structure And An Energy Storage With A Capacity Of 15 Kwh, F) Carrying Out The Necessary Installation Works Of The Existing Water Installation. -Ch. And Heating In Order To Adapt It To The Designed Conditions, G) Performing The Necessary Installation Works Of The Existing Electrical Installation In Order To Adapt It To The Designed Conditions, H) All Other Costs Related To The Execution Of The Order, I) Preparing An Application And Presenting The Technical Design Of The Photovoltaic Installation To The Fire Protection Expert For Approval, J) Notifying The State Fire Service About The Completion Of The Construction Of The Photovoltaic Installation, K) After Building The Photovoltaic Installation, Connecting It To The Operators Distribution Network. The Ordering Party Requires Preparation Of Documents Enabling The Signing Of A Comprehensive Agreement. Currently, The Ordering Party Has A Contract For The Distribution Of Electricity And The Supply Of Electricity For This Point. Comments: 1. The Ordering Party Informs That The Floor In The Boiler Room Should Be Made In Accordance With The Attachment Called Appendix No. 10 To Swz - 3. Boiler Room Floor - Cross-Section.2. The Ordering Party Informs That The Photovoltaic Panels On The Roof Should Be Installed Using A Ballast-Free System. This Means That The Panels Must Be Anchored Directly To The Flat Roof Slabs. Additionally, The Supporting Substructure And The Entire Installation Should Have Closed Spaces Under The Panels. The Ordering Party Requires The Contractor To Appoint A Construction Manager - General Construction Industry, Specializing In Construction.3. A Detailed Description Of The Subject Of The Order, The Scope Of Works And The Method Of Their Execution Is Described In The Design Documentation And Technical Specifications For The Execution And Acceptance Of Works Stwoir (Appendix No. 10 To Swz) And Bills Of Quantities (Appendix No. 9 To Swz).
Contact Information
Address
Gmina Święciechowa,Święciechowa,64-115,Wielkopolskie,Pl417 - Leszczyński
Contact No.
655333510
Email
urzadgminy@swieciechowa.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114755119
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.