Part 1 Of The Order - Reconstruction Of The Access Road To The Fields In Woźniki (Registration No. 165, 150) On A 498 Meter Long Section. The Scope Of Works Includes: 1) Surface Construction; A) Mechanical Cleaning And Sprinkling Of Asphalt Emulsion On The Existing Bituminous Surface - Emulsion Consumption 0.25 Kg/M2, B) Leveling Of The Existing Bituminous Surface With A Mineral-Asphalt Mixture With Mechanical Incorporation Ac16w - 100 Kg/M2 (From 0+320 - 0+820) And - 75 Kg/M2 (From 0+000 - 0+178 Section A),C) Mechanical Cleaning And Sprinkling Of Asphalt Emulsion On The Existing Bituminous Surface - Emulsion Consumption 0.25 Kg/M2,D) Surface Made Of Mineral And Bituminous Mixtures - Wearing Course Thickness. 4 Cm: Ac11s Kr 1-2. Make The Wearing Surface In Full Width, Without Technological Seams.2) Construction Of Ramps - Reclaimed Surface - Layer 0/31.5 After Compaction, Thickness. 15 Cm3) Construction Of Roadsides - Surface Of Roadsides Made Of Reclaimed Fraction 0/31.5, Top Layer After Compaction 15 Cm. The Detailed Description Of The Subject Of The Order Is The Technical Design, Stwiorb And Bill Of Quantities. In The Event Of Discrepancies Between The Provisions Of The Design Documentation And This Swz (In Particular The Draft Provisions Of The Contract), It Is Assumed That The Provisions Of The Swz Take Precedence. Note: Due To The Adopted Nature Of The Contractors Remuneration (Lump Sum). The Bill Of Quantities Has Only An Informative Function And Does Not Constitute The Basis For Calculating The Price By The Contractor. Before Starting The Works, The Contractor Is Obliged To Mark The Construction Site (Information And Warning Boards). Supplementary Works Required By The Ordering Party (Separately For Parts 1, 2, 3 Of The Order): 1) Full Geodetic Services For The Investment (On The Date Of Acceptance, The Contractor Should Have An As-Built Geodetic Map With Confirmation Of Contribution To The Geodetic Resource), 2) Preparation Of Acceptance Documentation In Polish, Containing At Least: A) The Original/Photocopy Of The Internal Construction Log, B) As-Built Geodetic Maps, C) The Original Written Declaration Of The Construction Manager: • About Ensuring The Proper Condition And Order Of The Construction Site, As Well As Roads, Streets, Neighboring Properties, Buildings And/Or Premises, • About The Appropriate Development Of The Areas Adjacent To The Construction Site To Enable Proper Operation Of The Constructed Facility. D) A List Of Built-In Facilities Materials Together With Documents Confirming Their Approval For Use In The Territory Of The Republic Of Poland, E) Original/Copy Of As-Built Design Documentation - Signed By The Construction Manager, F) List Of Significant Changes (If Any) With A Graphic Attachment, Signed By The Construction Manager, Supervision Inspector, Designer, Together With Documents Confirming The Correct Legalization Of These Changes, G) Electronic Version Of The Acceptance Documents And As-Built Documentation (Inven
Contact Information
Address
Gmina Lgota Wielka,Lgota Wielka,97-565,Łódzkie,Pl713 - Piotrkowski
Email
gmina@lgotawielka.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114753533
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.