|
Gas Leak Repair (7000 To 18000) With Supply Of Necessary Materials And Tools, Except Gas, Gas Leak Repair (24,000 To 60,000) With Supply Of Necessary Materials And Tools, Capacitor Changes (7000 To 18000) Btus, Capacitor Changes (24000) At 60,000) Btus, Change Of Control Board (On/Off) (7,000 To 18,000) Btus, Change Of Control Board (On/Off) (24,000 To 60,000) Btus, Change Of Supports (7,000 To 18,000) Btus, Change Of Supports (24,000 To 60,000) Btus, Exchange Of Parts And Other Mechanical, Electrical And Electronic Components Of Lower Incidence Of Exchanges/Repairs, Not Included In Items (7,000 To 18,000), Not Included In Items (24,000 To 60,000), Replacement Of Fan Motor And Other Mechanical Components, Turbine, Electronics Of Lower Incidence Of Exchanges/Repairs, For Equipment From (7,000 To 18,000), For Equipment From (24,000 To 60,000), Simple Cleaning On Site, With The Device Installed By Removing The Cover And Air Filter And Applying Specific Products. (7,000 To 18,000), With The Device Installed By Removing The Cover And Air Filter And Applying Specific Products. (24,000 To 60,000), Complete Cleaning Including Dismantling (Removing Equipment From The Wall) Of Parts And Equipment In The Area, Washing/Sanitising/Brushing And Removing Dirt With Specific Products. (7000 To 18000), Washing/Sanitizing/Brushing And Removing Dirt With Specific Products. (24,000 To 60,000), Complete Cleaning With Collection Bag (7,000 To 18,000), Complete Cleaning With Collection Bag (24,000 To 60,000), Cleaning The Air Conditioning Condenser Equipment (7000 To 18000), Cleaning The Air Conditioning Condenser Equipment (24000 To 60000), Installation Of Used Air Conditioning Equipment (7000 To 18000) Including Cado Pp 2X2, 50Mm With 20A Male Plug, Installation Of Used Air Conditioning Equipment (24000 To 60000) Including Cado Pp 2X2, 50Mm With 20A Male Plug (If Necessary), Installation Of New Air Conditioning Equipment (7000 To 18000) Including Cado Pp 2X2, Installation Of New Air Conditioning Equipment (24000 To 60000) Including Cado Pp 2X2, 50Mm With 20A Male Plug (If Necessary), Uninstallation Of Air Conditioning Equipment (7,000 A 18,000), Uninstallation Of Air Conditioning Equipment (24000 To 60000), Gas R-22, Gas R-410A Kg, Gas R-32, Gas R-141B (Fluid For Pipe Cleaning), Support In External Split Fiberglass 45 Mm From 7,000 To 18,000 Btus, Support In External Split Glass Fiber 50 Mm From 18,000 To 30,000 Btu, Galvanized Metal Support For Air Conditioning Condenser From 36,000 To 60,000 Btu, Crows Foot Support From 36,000 To 60,000 Btu, Split Capacitor From 7,000 To 18,000 Btu (For Compressor), Capacitor Split Capacitor From 24,000 To 60,000 Btus (For Compressor), Split Capacitor From 7,000 To 18,000 Btus (For Fan Motor), Split Capacitor From 24,000 To 60,000 Btus (For Fan Motor), Control Board (7,000 To 18,000) Conventional (On-Off), Control Board (24,000 To 60,000) Conventional (On-Off), Control Board (9,000 To 18,000) Inverter, Control Board (24,000 To 60,000) Inverter, Air Conditioning Piping 1/4 3/8, Air Conditioning Piping 1/4 1/2, Air Conditioning Piping 1/4 5/8, Air Conditioning Piping 3/8 3/4, 9,000 Btus Compressor, 12,000 Btus Compressor, 18,000 Btus Compressor, 22,000 To 24,000 Btus Compressor, 30,000 Btus Compressor, 36,0000 Btus Compressor, 60,0000 Btus, Drain Hose,
|