|
Tender for E-Quotation For Seeking Firm Rates For Non-Schedule Items For Preparing Estimates. , Supplying , Installation, Testing And Commissioning Of Vertical Turbine Pump Set With Ss Impeller Capable To Discharge 126 M3/Hr.Against Total Head Of 50 M, (Make Kirloskar/Jyoti/Wilo-Mather&Platt/Wpil) Coupled With Suitable Capacity Vertical Hollow Shaft/Solid Shaft Squirrel Cage Induction Motor , Rating Of Motor 20% More Bhp Than That Of Pump (Make Kirloskar /Abb /Cgl/ Siemens) Operated On 415 +/- 10% Volt, 3 Phase , 50 C/S A.C Supply , Ie3 Type As Per Is:325 And Iec:63400-Ihaving Speed 1450 Rpm,With Heavy Duty M.S. Column Assembly With Ss Line Shaft And Each Coloumn Of 5 Feet Length Including Cost Of Supplying , Fitting And Fixing Of All Required Accessories Such As Cidf Sluice Valve-1 Set, Cidf Nr Valve-1 Set, Pressure Gauge-1 No, Strainer-1 No, M.S. Channel Base Plate Etc. All Complete Including Cost Of Taken Out Existing Old Pumpset. , Supplying And Installation Of Fasd Starter Suitable For Above Mentioned Vt Pumpset Make Lk/Bch/Schneider. , Supplying And Laying Of 25 Mm2 , 1.1 Kv, 3 Core Pvc Insulated Unarmoured Copper Cable Make Polycab/Kei/Gloster, From Starter To Motor. , Supplying, Installation Testing And Commissioning Of Horizontal Split Casing Centrifugal Pump Set With Bronze Impeller Having Discharge 126 M3/Hr. Against Total Head Of 35 M, (Make - Kirloskar/Jyoti/Wilo-Mather&Platt/Wpil), Coupled With Suitable Capacity Squirrel Cage Induction Motor, Rating Of Motor 20% More Bhp Than That Of Pump(Make Kirloskar /Abb /Cgl/ Siemens) ,Tefc, Ie3 Type As Per Is:325 And Iec:63400-Ihaving Speed 1450 Rpm,Operated On 415 +/- 10% Volt, 3 Phase , 50 C/S A.C Supply, Mounted On A Commonm.S. Base Plate Including Cost Of Supplying , Fitting And Fixing Of All Required Accessories Such As Cidf Sluice Valve-1 Set, Cidf Nr Valve-1 Set, Pressure Gauge-1 No, Foot Valve-1No, Etc. All Complete Including Cost Of Taken Out Existing Old Pumpset. , Supplying And Installation Of Fasd Starter Suitable For Above Mentioned C/F Pumpset Make Lk/Bch/Schneider. , Supplying And Laying Of 16 Mm2 , 1.1 Kv, 3 Core Pvc Insulated Unarmoured Copper Cable Make Polycab/Kei/Gloster, From Starter To Motor. , Cost Towards Complete Repairing Of Control Panel At Intake Well With Changing Of Damaged Parts Such As :- 1.150 annual periodical maintenance Tpn Mccb,50 Ka -1 No. As Incoming Feeder. 2. 75 annual periodical maintenance Tp Mccb, 50 Ka-2No As Outgoing Feeder. 3.Star Delta Timer-2Nos(One For Each Starter) 4. 32 annual periodical maintenance Switch Fuse Unit -01 No. For Internal And External Light Load. 5. (0-500 V) Volt Meter-01 No., Ampere Meter-01 No.,Three Phase Indicator Lamp,Powder Coating Paint,Push Button On/Off,On/Off/Trip Indicator Lamp,Wiring,Etc As Per Required And Testing On Full Load . , Cost Towards Providing All Labour, Tools And Technicians For Taken Out And Dismantling 40 Hp Vt P/Set With Bowl Assembly, 6 Dia. Coloumn Pipe And Line Shaft Etc All Complete. , Cost Towards Dismantling And Repairing Of Complete Bowl Assembly. , Cost Towards Making Supplying And Fitting S.S. Top Shaft As Per Size And Sample. , Cost Towards Making Supplying And Fitting Of C.I. Spider Bearing Having Od 6.5 With Rubber Bush As Per Size And Sample. , Cost Towards Lowering Of Vt P/Set. After Complete Repairing And Assembling Works. , Cost Towards Complete Repairing Of Control Panel At Clear Water Pump House With Changing Of Damaged Parts Such As :- 1.125 annual periodical maintenance Tpn Mccb,50 Ka -1 No. As Incoming Feeder. 2. 63 annual periodical maintenance Tp Mccb, 50 Ka-2No As Outgoing Feeder. 3.Star Delta Timer-2Nos(One For Each Starter) 4. 32 annual periodical maintenance Switch Fuse Unit -01 No. For Internal And External Light Load. 5. (0-500 V) Volt Meter-01 No., Ampere Meter-01 No.,Three Phase Indicator Lamp,Powder Coating Paint,Push Button On/Off,On/Off/Trip Indicator Lamp,Wiring,Etc As Per Required And Testing On Full Load .
|