|
Prior Information Notice For Repair And Maintenance Services Of Water Meters – Replacement Of Water Meters, Heat Meters And Heat Allocators. 1. Delivery And Replacement Of 1,263 Cold Water Meters Equipped With Remote Reading Devices 2. Delivery And Replacement Of 676 Hot Water Meters Equipped With Remote Reading Devices 3. Delivery And Replacement Of 882 Heat Meters Equipped With Remote Reading Devices 4. Construction Of Additional Water Meter Sockets In 181 Premises And Installation Of 181 Cold Water Water Meters Equipped With Devices For Remote Reading 5. Delivery And Installation Of 357 Heat Allocators Equipped With Remote Reading Devices 6. Installation Of 3,001 Ball Valves 7. Delivery Of Software And Granting A License For A Period Of 5 Years For Configuration And Reading To Operate The Remote Reading System For Min. 3,358 Water Meters, Heat Meters And Heat Allocators With 2 Pieces Of Portable Radio Modems (Communication Modules With Mobile Reading Devices (Laptop, Tablet, Smartphone) 8. Implementation And Configuration Of The System With Devices (Water Meters, Heat Meters, Heat Dividers, Radio Modems, Mobile Reading Devices), Conducting Reading Training. Additional Information: 1. Order Regarding Point 1-5 Includes: Sealing Of The Installed Devices Along With The Acceptance Protocol, Taking Readings After Installing The Devices (Inventory Of New And Old Devices) 2. The Subject Of The Order Will Be Implemented In Residential Buildings And Commercial Premises: Approx. Water Meters Includes: Disconnecting The Screw Connections, Dismantling The Old Water Meter, Replacing The Ball Valve, Preparing The Approach To The Water Meter If It Is Necessary To Prepare The Installation For Installation, Installing A New Water Meter And Sealing The Connections, Installing A Snap Seal On The Union On The Supply Side, Preparing An Installation Report, Preparing And Delivering A Reading List, Taking Photos Of The Old And New Water Meters 5. Replacing Heat Meters Includes: Disconnection Screw Connections, Disassembly Of The Old Heat Meter, Installation Of A New One And Sealing The Connections, Installation Of Snap Seals On The Screw Connections, Preparation Of An Assembly Report, Preparation, Delivery Of A Reading List, Taking Photos Of The Old And New Heat Meter 6. Installation Of Cost Allocators Includes: Disassembly Of Old Allocators, Delivery And Installation Of New Ones With Radio Reading On Radiators, Sealing Of Allocators, Preparation Of An Assembly Report, Taking Photos Of The Old And New Allocators 7. When Constructing Additional Water Meter Sockets, The Contractor Will Make The Sockets In A Way That Ensures Easy Access To Reading And Replacing The Meter, And Will Repair Any Damage Caused During The Work Performed. 8. The Contractors Offer Will Include The Disposal Of Demolition Materials. Water Meters Should Meet The Requirements Of The Regulation Of October 23, 2007 On The Requirements To Be Met By Water Meters And The Detailed Scope Of Checks Performed During The Legal Metrological Inspection Of These Measuring Instruments. (Oj 2007.209.1513), Directive 2014/32/Ec (Mid)
|