Electrical Wiring And Fitting Work – Electrical Cable And Wiring Systems In Buildings, Electrical Installation Work For High And Low Current. Electrical Installation Work For High And Low Current In Charlottenburger Chaussee 67.75 House 16. As Part Of The Construction Project “House 16 - Modernization And Repair” On The Property Charlottenburger Chaussee 67/75, 13597 Berlin, The Following Services Are Being Tendered: 17,100 M - Installation Cable 1X6 To 1X25sqmm And 3X1.5 To 5X6sqmm, 865 M - High-Voltage Cable From 5X16 To 4X70/35Mm², 26 M - High-Voltage Cable 4X185mm², 1,900 M - Low-Current Cable 2X2x0.8Mm Or 4X2x0.8Mm 100 M - Low-Current Cable 100X2x0.8Mm 40 M - High-Current Cable From 3X2.5Mm With Functional Maintenance E30, 23,300 M - Copper Data Line, 530 M - Cable Tray And Vertical Ladder, 600 M - Device Installation And Lf Channel, 270 Pieces - Wall Brackets For Device Installation Channel, 1,900 M - Cover Lamella For Wall Consoles 20 M - I30 Fire Protection Cable Duct, 240 M - Installation Pipe, 2 Pieces - Main Distributor, 11 Pieces - Sub-Distributors, 940 Pieces - Installation Devices, 70 Pieces - Presence Detectors, 500 Pieces - Junction Boxes, 1 Piece - Outdoor Socket Wall Distributor, 430 Pieces - Led Lights, Led Spotlights, 67 Pieces - Safety And Escape Sign Lights (Single Battery), 12 Pieces - Emergency Light Converter Led, 1 S - Central Testing And Monitoring Unit For Single-Battery Lights, 3 Pieces - Network Cabinets, 22 Pcs - Patch Panels Cat.6A, 3 Pcs - Patch Panels Cat.3, 240 Pcs - Data Sockets, 32 Pcs - Video / Audio Connection Boxes, 230 Pcs - Core Drillings, 125 Pcs - Fire Barriers For Cables And Wires, 4 Pcs - Building Entries, As Well As Various Connection Work, Testing And Measuring Work, Programming Dali Control Lights, Documentation, Dismantling Work / Disposal: 1,000 Kg - Cables/Wires 25 M - Cable Tray 1 Piece - Main Building Distribution
|