|
Engineering Design Services – Egri Bypass Eng. And Making Construction Plans. The Egri Bypass Starts From The Roundabout Of The M25 Motorway And Runs On The Eastern Side Of The City Of Eger, Providing A Connection To Roads 25 And 24. Between The Main Road, As Well As Bypassing The Felnémet District At 25. Connects To The Main Road. Duties: Preparation Of Full-Scale Licensing Plans With Decision-Making Documentation Establishing Their Details And Certain Technical Parameters, Preparation Of Licensing, Feasibility Study, And Preparation, Licensing And Approval Of Full-Scale Implementation Plans, According To The Technical Content Specified In The Design Task Description Issued As Part Of The Ad. The Main Estimated Quantities Are For Informational Purposes Only: About 17 Km Of National Road, Which Is Planned To Be 2X2-Lane For ~1.4 Km (With The Reconstruction Of The Existing 2X1-Lane Road), ~15.6 Km For A Continuous Length Of 2X1-Lane National Road (Planned On A New Route). Part Of The Project Is The Planning Of Approximately 9 Km Of Local Public Roads (~6 Km Of New Track, ~3 Km Of Pavement Reinforcement), 13 Roundabouts (Of Which 3 Are Turbo Roundabouts), The Reconstruction Of 7 Level Junctions, The Construction Of 12 Simple Or Vehicle Classification Junctions, The Construction Of 6 New Structures, The Reconstruction Of 3 Existing Structures, And The Construction Of 1 Railway Level Connection. A New 2X2-Lane National Road Bridge Over The Railway Has The Largest Superstructure Length Of 81.8 M Among The Structures. The Design Of The Construction Of Handrails, Retaining Walls, And Notches On Some Sections Of The Bypass Road, As Well As The Design Of Bicycle Path Sections (New Trail, ~1 Km Long), The Construction Of Footpaths And Sidewalks (2.7 Km Long), And The Expected Construction Of 2 Pedestrian Crossings Are Also Part Of The Project. The Winning Tenderer Is Obliged To Cooperate In The Public Procurement Procedures To Be Conducted For The Implementation Of The Construction Investment Based On The Plans Prepared By Him Or A Part Of Them, As Detailed In The Draft Contract. In The Case Of Full-Scale Licensing And Full-Scale Construction Plans, Planning Is Based On A Building Information Model (Bim), 31/2024. (Viii. 22.) According To The Ekm Decree. The Bim Requirements Are Included In The Design Task Description. The Tenderer Draws Attention To The Fact That - The Basic Task To Be Performed Within The Framework Of The Contract To Be Concluded As A Result Of This Procedure Is The Preparation Of The Preparatory Decision Documentation, The Feasibility Study And The Full-Scale Licensing Plans, Obtaining Permits; - The Complete Construction And Tender Plans, As Well As The (Public) Procurement Documentation Suitable For Execution Iii., Iv. And V., The Contractual Agreement Issued As Part Of The Ad Contains A Separate Entry Into Force Condition Of The Ábtv. In View Of Paragraph (1) Of § 41; - The Ábtv. Design Supervision Defined In § 19, Paragraph (1) Arising During The Implementation Phase Of The State Construction Investment Is Called Up As An Option (For More Information, See: Ii.2.11) Information On Options, Field Bt-53). The Design Management K
|