Accumulators, Primary Cells And Primary Batteries – Delivery, Construction And Commissioning Of A Large Battery Storage System. The Göritzberg Citizen Solar Park Is An Existing Open-Space Pv System At The Location 07616 Bürgel Ot Göritzberg, Thuringia (Approx. 350 M Above Sea Level). The System Was Built In The Municipality Of Bürgel In The Saale-Holzland District And Has Been In Successful Operation Since The Beginning Of 2026. The Pv System Has 12 Huawei Sun2000-330Ktl-H1 Inverters With A Total Installed Power Of 3,960 Kw (12 × 330 Kw). At The Grid Connection Point (Nap), The Feed-In Power Is Limited To 3,325 Kw (Full Feed-In, No Island Operation). Monitoring Is Carried Out Via A Dexcon Parking Controller. The System Is Operated On The 20 Kv Medium-Voltage Cable Ring Toz01-Ser03 From Thüringer Energienetze (Ten). The Transfer Station Is St Despite 02 [Toz02]. The Pv Feed-In Takes Place Via 2 Transformers (Each 20 Kv / 2.0 Mva, Switching Group Dyn5, Uk=6%). A Phoenix Contact Sol-Sa-Pcu-41Xx Is Used As The Eza Controller, Which Regulates The Feed-In Power In Accordance With The Specifications Of The Network Operator Ten.
Contact Information
Contact No.
+49 3641 688-206
Email
einkauf@stadtwerke-jena.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114668929
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.