1. Name Of The Task Given By The Ordering Party: Reconstruction Of The Bridge Along District Road No. 3D In Lądek Zdrój, Km 0+479 (Flood - September 2024) 2. The Subject Of The Order Is: Construction Works. The Scope Of The Order Includes The Performance Of Construction Works Consisting In The Reconstruction Of The Bridge Located Along The District Road No. 3D In Lądek-Zdrój, Together With The Reconstruction And Reconstruction Of The Road System, Drainage And Technical Infrastructure, As Well As The Performance Of All Accompanying, Temporary And Auxiliary Works Necessary For The Proper Implementation Of The Investment, Achieving Its Purpose And Obtaining The Possibility Of Using The Facility In Accordance With Its Intended Purpose, Design Documentation, Stwiorb, Applicable Legal Regulations And Principles Of Technical Knowledge. 3. Detailed Scope And Principles Of Technical Knowledge. The Technology For Carrying Out The Works Was Specified In The Design And Technical Documentation Constituting Annexes To The Swz. The General Scope Of The Order Includes In Particular: 1) Preparatory, Surveying And Organizational Works: Including The Development, Agreement And Implementation Of A Temporary Traffic Organization Project For The Duration Of Construction, Surveying Services Along With Post-Construction Inventory And Protection Of Existing Networks. 2) Demolition And Dismantling Works: Including The Demolition Of The Damaged Road Surface, Sidewalks, Sub-Bases, Barriers, Curbs, Retaining Walls And The Dismantling Of The Damaged Bridge Structure (Pillar, Abutments, Bridge Slab).3) Earthworks And Foundation Works: Channeling, Deepened Channeling In Flood Washout Areas, Construction Of Embankments, Engineering Embankments And Foundation Works Including The Construction Of The Foundations Of The Facility Along With Their Anchoring In The Rock Bed In Accordance With The Design Documentation.4) Reconstruction Of The Bridge Structure And Retaining Walls: Including The Construction Of New Supports, Retaining Walls Made Of Structural Concrete With Stone (Granite) Facing, Installation Of New Bearings, Construction Of A Supporting Structure With An Arched Structure Together With A Reinforced Concrete Deck Slab.5) Construction Of Road And Pedestrian Surfaces (Approaches To The Bridge): Construction Of New Structural Layers Of The Road Surface For Load Class Kr 3 (Subbases And Bituminous Layers Ac/Sma), Reconstruction Of Sidewalks, Exits And Parking Spaces From Slabs, Stone Cubes And Surfaces For The Visually Impaired, Reconstruction And Reconstruction Of The Pedestrian Promenade Along The Biała Lądecka River In Accordance With The Design Documentation.6) Drainage And Storm Sewerage: Reconstruction Of Collectors And Storm Sewerage Channels Made Of Pvc Pipes Along With Wells And Inlets, Reconstruction Of Outlets To The River With A Non-Return Valve And Installation Of A Drainage System For The Bridge Structure (Drains, Drains, Polymer Concrete Beds, Pipelines Pehd).7)
|