The Subject Of The Order Are Construction Works For The Construction Of A Gazebo On Plot No. 54/1 In Wysokie As Part Of The Investment Project Titled Construction Of A Gazebo At The Playground Of The School In Wysokie. Place Of Investment Implementation: Plot No. 54/1, District 0028 Wysokie, Zamość Commune.1. The Scope Of These Works Includes In Particular: A) Construction Of The Gazebo: Dimensions 5.0 M X 7.0 M, Wooden Structure (Impregnated, Colors In Accordance With The Design Documentation), Placed Directly On Reinforced Concrete Foundation Footings, Gazebo Walls Partially Covered With Openworks, Roof Covering With Trapezoidal Sheets, Roof Drainage Using Gutters And Pipes Drains, Gazebo Floor Made Of Gray Paving Stones. 6 Cm.B) Gazebo Equipment: Structure For Vines - 1 Pc., Chalkboard, Pc. 1, Boxes Serving As Seats, Pcs. 2.C) Surfaces And Equipment Of The Square: Aggregate Surface - 71 M², Bark Surface - 42 M², Raised Beds With Filling In Accordance With With Design - 10 Pcs., Entrance Pergola - 1 Pc., Coffee Tables - 8 Pcs., Rain Barrel - Pc. 1, Wicket Pcs. 1. It Is Allowed To Install Devices Slightly Different In Size From The Designed Ones (+/- 5%), However, Their Function Must Be Maintained And The Technical Parameters Cannot Be Worse Than Those Indicated In The Design. The Subject Of The Order Must Be Performed In Accordance With Applicable Legal Regulations, In Particular The Act Of July 7, 1994 Construction Law (Journal Of Laws Of 2026, Item 524) Along With Implementing Regulations, Standards, Instructions Of The Manufacturers Of The Equipment And Materials Used, Principles Of Technical Knowledge And Construction Practice. The Materials Delivered And Used By The Contractor Should Meet The Quality Requirements Of Products Approved For Trading And Use In Construction, Specified In Art. 10 Of The Act Of July 7, 1994, Construction Law (Journal Of Laws Of 2026, Item 524). Additionally, The Execution Of The Subject Of The Order Must Also Be Consistent With All Legal Acts Applicable To The Subject Of The Order, With Technical And Construction Regulations, Applicable Standards And Guidelines. During The Execution Of The Order, The Contractor Is Obliged To Take Into Account All Conditions Of The Existing Infrastructure. The Detailed Type Of Construction Works And The Scope Of Works Were Specified In The Documentation Attached To The Procedure, Which Includes: A) Technical Documentation, B) Technical Specification For The Execution And Acceptance Of Works, C) Bill Of Quantities Attached As Auxiliary. The Detailed Type Of Construction Works And The Scope Of Works Were Included In The Technical Documentation, Technical Specification For The Execution And Acceptance Of Construction Works And In The Bill Of Quantities Constituting Annex No. 9 To Swz And In Polish Standards Or Approvals Technical. The Order Will Be Settled On A Flat Rate Basis.
|