1. The Subject Of The Task Is To Carry Out Construction And Conservation Works In The Basement Of The Eastern Wall Of The Krakow Bishops Castle In Siewierz.2. A Detailed Description Of The Subject Of The Order Is Specified In This Specification Of Terms Of Order (Swz), In The Decision Of The Silesian Provincial Conservator Of Monuments - Permission To Conduct Construction And Conservation Works On The Monument Of October 20, 2025, In The Design Documentation And The Technical Specification For The Execution And Acceptance Of The Works. The Design Documentation Covers A Wider Scope Of Work Than The Subject Of The Contract Specified In This Tender Procedure. An Overview Of The Scope Of Work Is Indicated In The Graphic Attachment - Appendix No. 7 To The Swz. The Bill Of Quantities Is Of An Auxiliary Nature In Preparing The Offer.3. As Part Of The Order, The Contractor Will Be Obliged To Perform All Necessary Renovation And Conservation Works, Consisting Of Partial Reconstruction Of The Eastern Wing, Renovation Of The Eastern Basement And Reconstruction Of The Electrical Installation Along With Accompanying Works, In Particular: 1) Archaeological Research - The Contractor Will Be Obliged To Obtain A Conservation Permit For Archaeological Research And To Conduct Research. 2) Demolition Works. 3) Conservation Works, I.E. Horizontal Insulation, Conservation Of The Stone Face And Conservation Relics Of The Vaults.4) Conservation Works In The Basement With Xps Insulation And Cement Floor, Insulation And A Layer Of Terracotta Tiles.5) Reconstruction Of Stairs To The Basement.6) Construction Of Solid Brick Vaults At The Basement Level.7) Installation Of Window Joinery With A Grille And Doors At The Basement Level.8) Vertical Insulation Of The Basement.9) Conservation Works On The Ground Floor In Rooms 0.2 Vestibule, 0.3 Hall Exhibition Hall, 0.4 Exhibition Hall - In The Scope Of Execution Of Reinforced Concrete Floor Slabs With Reinforcement, As Well As Insulation And Screed In The Room 0.4 Exhibition Hall.10) Carrying Out Electrical Works Between The Ground Floor And Basement Levels, Including Installation Of Fixtures.11) Carrying Out Cleaning Works After Completion Of The Works. Under The Agreement, The Contractor Will Perform Cleaning Work, In Particular The Contractor Will Be Obliged To Restore It To Its Original Condition.12) Carry Out Accompanying Works Necessary For The Comprehensive Implementation Of The Task.13) Prepare And Provide The Ordering Party With Complete As-Built Documentation.4. As Part Of The Subject Of The Order, The Ordering Party Transfers To The Contractor The Obligations And Conditions Imposed By The Silesian Provincial Conservator Of Monuments In The Permit Issued On October 20, 2025. - The Contractor Will Be Obliged To Meet All Conservation Conditions And Requirements, With The Exception Of Ensuring A Person Intended To Perform Investor Supervision Over The Implementation Of The Investment Referred To In Point. 2 Letter D) Decisi
Contact Information
Address
Gmina Siewierz,Siewierz,42-470,Śląskie,Pl22b - Sosnowiecki
Contact No.
326499400
Email
siewierz@siewierz.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114666093
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.