Task No. 1: Construction Of A Playground At The Local Government Kindergarten In Gamowo - A Task Co-Financed By The European Funds For Silesia Program 2021-2027 (Lump Sum - Esf+). The Investment Area Is Located On Plots No. 644 And 648 In Gamowo. Currently, The Area Covered By The Study Is Developed For A Sports Function, There Is A Grass Pitch There. Scope Of Works: - Relocation Of Old Equipment From Existing Playground From Plots No. 648 And 649 To Plot No. 644 And To Plot No. 648 (Disassembly And Reassembly Of Existing Playground Equipment); - Construction Of A Trough For The Layers Of Shock-Absorbing Surface Made Of Synthetic Puzzles And Hardening With Concrete Cubes; - Delivery And Installation Of The Designed Playground Equipment; - Laying Of Sidewalk Edges; - Laying Of The Edges Of The Safe Surface; - Hardening Made Of Concrete Cubes; - Construction Of The Substructure; - Laying Of A Synthetic Surface Made Of Tiles Made Of Sbr Granules; - Laying Mats In Accordance With The Technology: - Construction Of A Fence; - Installation Of Small Architecture Elements; - Tidying Up The Area. Technical Requirements And Construction Details Must Be Made Of Safe And Durable Materials, In Accordance With Polish Standards And Safety Conditions 1176:2009, Pn-En 16630:2015 And Pn-En 1177 (Or Equivalent Standards) Regarding The Safety Of Fall-Absorbing Surface Devices. In The Fall Zone, A Shock-Absorbing Surface Should Be Made In Accordance With Pn-En 1177 (Or An Equivalent Standard). Two Types Of Surfaces Are Planned: A) Synthetic Puzzles - Before Arranging The Puzzles, The Ground Must Be Properly Prepared, And The Foundation Is Planned. Of Aggregate As Permeable, Consisting Of The Following Layers: - Cement-Sand Backfill (1:4), 5 Cm Thick, - A Leveling Layer Of At Least 2 Cm Thick, Made Of Mechanically Stabilized Crushed Aggregate, At Least 15 Cm Thick, - A Drainage Layer. 10 Cm Thick, Made Of Mechanically Stabilized Sand, - Compacted Native Soil. The Entire Surface Of The Safety Zone Should Be Finished With A Concrete Edge. The Depth Of The Surface Should Be Adjusted To The Height Of The Free Fall Of The Device. B) Concrete Cubes - In Order To Improve The Accessibility Of The Playground, It Is Planned To Harden It With Concrete Cubes, The Sidewalk Should Be Made Of The Following Layers: - Gray And Red Concrete Cubes 20.0 X 10.0 Cm, 6.0 Cm Thick, - Crushed Stone Bedding 2/6 Mm Thick, - Crushed Aggregate 0/31.5 Mm Thick, 10.0 Cm Thick (Basalt Aggregate, Root Aggregate, 10.0 Cm Thick), - Existing Stabilized Soil Mechanically. The Entire Hardening Surface Should Be Finished With A Concrete Edge. Total Thickness Of The Structure - 29.0 Cm. Old Devices That Are To Be Transferred From The Existing Playground No. 648 To Plot No. 644 And To Plot No. 648A) Set With A Tower: B) Standard Double Swingc) Single Swing Storks Nestd) Sandboxe) Star Boardf) Garden Houseg) Bench With Backrest - 1 Pc.H) Bench Without Backrest - 2 Pcs. A Detailed Description Of The Work Relate
Contact Information
Address
Gmina Rudnik,Rudnik,47-411,Śląskie,Pl227 - Rybnicki
Email
przetargi@gmina-rudnik.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114615855
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.