|
The Subject Of The Contract Will Include: 1) Construction Of New And Renovation (Reconstruction) Of Thin-Layer Road Markings (White, Red, Blue, Green And Orange) With Paint Intended For Horizontal Road Markings, Adapted For Sprinkling With Glass Beads, With A Coating Thickness Of The Horizontal Sign (Measured Wet) Of 0.4-0.8 Mm. 2) Construction Of New And Renovation (Reproduction) Of Thick-Layer Road Markings Made Of Mass Chemically Hardened Layer Applied With A Thickness Of 0.9-3.5 Mm, Adapted For Sprinkling With Glass Beads, 3) Removal Of Horizontal Road Signs Made Using Thin-Layer And Thick-Layer Technology. Estimated Scope Of Works: − Thin-Layer Horizontal Markings With Paint Intended For Horizontal Markings Of Urban Roads Using Glass Beads, Including: • Continuous Segregation And Edge Lines, • Broken Segregation And Edge Lines, • Crossings For Pedestrians, • Transverse And Supplementary Signs, • Arrows, • Marking Of The Crossing Area For Cyclists (Red), • Marking Of Parking Spaces For Disabled People (Blue), − Execution Of Vertical Sign Symbols In Horizontal Markings - Thermal Signs, − Execution Of Vertical Sign Symbols In Thin-Layer Horizontal Marking - Pictograms (White And Colored), − Thick-Layer Horizontal Markings Made Of Chemically Hardened Masses (White And Colored). Colored), − Thick-Layer Horizontal Markings Made Of Chemically Hardened Masses – Vibrating Strips, Thick. 4 Mm (Color), − Symbols Of Vertical Signs In Horizontal Markings, Thick-Layer Thermoplastic, Thick. 4 Mm - Pictograms (Colored), − Elimination Of The Existing Marking: • Thin-Layer, • Thick-Layer, − Temporary Marking With A 12 Cm Wide Yellow Self-Adhesive Tape. All Horizontal Markings Are To Be Smooth. Only Selected Red Fillings Of Pedestrian Crossings Are Made In A Structural Form - Regular Structure (Improving Roughness). Pictograms Of Vertical Signs Are Made As Thermoplastics: − Colored Ellipse 1400X2500 Mm – Sign B33, − Colored Square 1400X1400 Mm – Sign B-43, − Colored Stop Sign 1500X1500 Mm, − Colored Triangle 1400X2500 Mm – Signs A-16, A-17, A-24, − Red Acoustic Lines, Possibly The Words Stop, Bus. The Detailed Scope Of Works, Location And Completion Date Will Be Agreed On An Ongoing Basis With The Contractor In Accordance With The Ordering Partys Instructions. The Contract Is Terminated When The Value Of The Works Performed Reaches The Value Of The Subject Of The Contract, Of Which The Ordering Party Will Notify The Contractor In Writing. The Quantitative Scope Of Individual Works Is Included In The Table Of Settlement Elements, Which Is An Integral Part And An Annex To The Swz (Annex To The Bid Form). The Quantities Of Works Specified In Individual Items Of The Ter (Col. 5) Are Not Final And Are Provided Indicatively (Estimated) In Order To Provide Contractors With A Common Basis For Preparing Offers. The Actual Quantities Of Commissioned Works During The Period Of Implementation Of The Subject Of The Contract May Differ From The Assumed (Estimated) Quantitie
|