1. The Subject Of The Order Is The Modernization Of The Road On Plot No. 2805/2 In Harbutowice. The Investment Is Being Carried Out On A Section With A Total Length Of 325 Meters (On A Section Of 215 Meters There Is Reconstruction, Including The Construction Of An Asphalt Surface With A Base, And On A Section Of 110 Meters There Is Renovation Of The Surface, Including The Construction Of A 5 Cm Thick Asphalt Overlay On The Existing Asphalt)2. As Part Of The Reconstruction, It Is Planned To Build A New Road Surface And A Structure In The Form Of A Wearing Course Made Of Asphalt Concrete. 5 Cm, Binding Layer Of Asphalt Concrete, Thickness. 5 Cm And A Base Base Made Of Mechanically Stabilized Crushed Aggregate, Thickness. 28 Cm. The Total Thickness Of The Construction Layers Is 38 Cm. 3. It Was Assumed That Unfavorable Ground Conditions Would Occur - Overlying Or Questionable Soil, Therefore The Installation Of A Separating And Cutting Geotextile Was Designed. 4. The Detailed Scope Of The Works Planned To Be Carried Out Is Described In The Design Documentation Constituting An Annex To The Terms Of Reference. 5. Identification Of The Contract According To The Common Procurement Vocabulary (Cpv): 45233220-7 Road Surface Works6. Requirements Related To The Implementation Of The Order In Terms Of Employment By The Contractor Or Subcontractor On The Basis Of An Employment Relationship Of Persons Performing The Activities Specified By The Ordering Party In The Scope Of The Implementation Of The Order, If The Performance Of These Activities Involves Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Consolidated Text: Journal Of Laws Of 2025, Item 277, As Amended) Cover The Following Types Of Activities: The Ordering Party Requires The Contractor Or Subcontractor To Employ, On The Basis Of An Employment Relationship, Persons Performing Basic Technical Activities Or Construction Works During The Execution Of The Order, Qualified As Manual Workers (I.E. Persons Involved In Operating Equipment Construction, Persons Performing Physical Work) With The Exception Of Persons Performing Independent Technical Functions In Construction, Pursuant To Art. 12 Et Seq. Construction Law. During The Execution Of The Order, The Ordering Party Is Entitled To Perform Inspection Activities Towards The Contractor Regarding The Fulfillment By The Contractor Or Subcontractor Of The Requirement To Employ Persons Performing The Above-Mentioned Activities On The Basis Of An Employment Relationship. The Ordering Party Is Entitled In Particular To: A) Request Declarations And Documents Confirming Compliance With The Above-Mentioned Requirements. Requirements And Assessing Them, B) Request Explanations In Case Of Doubts Regarding Confirmation Of Compliance With The Above-Mentioned Requirements. Requirements; C) Carrying Out On-Site Inspections. The Detailed Procedure And Manner Of Carrying Out The Above-Described Verification Are Regulated B
Contact Information
Address
Gmina Sułkowice,Sułkowice,32-440,Małopolskie,Pl214 - Krakowski
Email
sulkowice@sulkowice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114513746
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.