Quotation are invited for Reinstatement Rock Revetment and Precast Slab Movement in Sea Water Intake Channel at "L" Station - JAPS 1032602460 1 ITEM-00001 PRELIMINARIES INCLUDING,SITE MOBILIZATION, SITE STORAGE FACILITIES, PREPARATION OF DRAWINGS ANDAPPROVALS, METHOD STATEMENTS AND APPR OVALS, 20 TO 35T ROUGH TERRAINMOBILE CRANE OR BARGE CRANE, DIVERS ,INSURANCE COVER, ALLOW FOR THIRDPARTY CERTIFIED SAFETY GEARS APPL ICABLE FOR THE WHOLE WORKS, TRANSPORTOF LABOUR & TEMPORARY MATERIALS TO AND FROM THE SITE, WELFARE & MESSINGFACILITIES OF EMPLOYEE S, PROVISION OF TEMPORARY WORKS, RESTRICTIONS ANDACCESS CONTROL, SITE LIMITATIONS AND WORKING SPACE, SMALL PLANTS ANDTOOLS, SAFEGUAR DING EXISTING SERVICES AND FACILITIES, ENGINEERSINSPECTION AND APPROVALS, MAINTAINING RECORDS, PROGRESS REPORT ANDPHOTOS, CARTING A WAY OF WASTE MATERIALS. ALLOWANCE FOR HSE REQUIREMENTSON SITE, TEMPORARY WORKS, DOCUMENTATION SUCH AS METHODOLOGY OF 1 LS WORK,DOCUMENTS SUBMITTALS, HSE PLAN, QAQC PLANT, WORK PROGRAMME, REPORTS,SHOP DRAWINGS AND AS-BUILD DRAWINGS.(GENERALLY, ALL EXPENSES INCURRED AND NOT ITEMIZED OR COVERED ELSEWHEREIN THE BILL OF QUANTITIES ARE TO BE INCLUDED IN THIS ITEM. ANY OTHERITEMS, CLAUSE OR SUB CLAUSE OF THE PRELIMINARIES NOT PRICED AS PERSPECIFICATION OR REQUIRED TO COMPLETE THE WORK, IT WILL BE DEEMED THATTHE VALUE OF SUCH ITEMS ARE INCLUDED IN THE RATES OF OTHER ITEMS IN THEBILL OF QUANTITIES) 2 ITEM-00001 REINSTATEMENT OF ROCK REVETMENTSUPPLY NEW GEO-TEXTILE SHEETINGS AND REINSTATE ROCK REVETMENT AS PEREXISTING PROFILE, BACK FILLING SE LECTION OF ROCK SIZE SHALL MATCH THEEXISTING ETC., COMPLETE TO APPROVAL OF ENGINEER IN CHARGE. 36 M2 SPECIAL NOTES / INSTRUCTIONS: Reinstatement Rock Revetment and Precast slab Movement in sea water intake Channel at "L" station - JAPS Contact: Sankar / 508662748 Site Visit: 11.06.2026 @10:00 Payment: 100% on completion of all works 5% Retention STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601373)/$value
|