Repair And Maintenance Services – Barrier Stand And Barrier Gear Maintenance. Tasks To Be Performed: Phase I (Completion Deadline: Sap According To The Customer): Surface Treatment And Assembly Of The Barrier Stand: (1 Pc) • Surface Treatment Of The Barrier Stand Provided By The Operator, With Sandblasting And Full Painting. Installation • Realization Of Electrical Connections Between Mounted Components (Signal Arrestors, Unit Frames, Clamping Strips Designed To Receive Electronic Devices, Fuses And Cables) Based On The Technical Documentation And Plans Provided By The Operator (Appendix No. 1) • Marking Of Wires Ensuring Connection • Placement Of A Technical Mark On Installed Free-Switching Signal Arrestors • Circuit Plans Are Provided By The Customer. This Is Complemented By The Station Fitting Designed By Bubes Designer. Activation And Testing Of Barrier Stand In Workshop Conditions: (1 Pc) • After Wiring The Equipment, Activation Of Equipment In Workshop Conditions Semi-Barrier Gearbox Maintenance, According To Technical Content: (4 Pcs) • Continuous Consultation With The Máv Design Colleague. • Carrying Out Any Repairs Necessary For Full-Fledged Faultless Operation Of The Artificial Current Circuit. • Replacement Of 4 Afit Semi-Barrier Gearboxes With Ma Hsh Type. For The Replacement, The Customer Provides The Engines To Be Renewed. The Factory Renovation Of The Engine Must Be Carried Out Within The Framework Of Phase I. Maintenance Of Barrier Light Indicators, In Accordance With The Technical Content: (6 Pcs.) The Tenderer Draws Attention To The Fact That The Entire Axle Counter System Necessary For The Operation Of The Barrier Must Be Priced In The Works Of Phase I In The Following Breakdown: 4 Pcs. Rsr123 Wheel Sensor + Mounting Assembly + With 5 M Cable, 1 Pc. Bgt05 Rack Small, 4 Pcs. Bsi005, 2 Pcs. Abp-2 Motherboard, 2 Pcs Sic Cards, 2 Pcs Acb119 Cards, 4 Pcs Imc039 Cards, 4 Pcs Cable End Caps) Phase Ii./A (Completion Deadline: According To The Sap Customer): • Digging Cable Trenches, Securing Cables: 1,500 Running Meters • Cable Laying: Laying 1,500 Running Meters Of Hvrq 5X4x0.8 Type Cable, Including Material For The Axis Counting Points (Technical Description According To Annex No. 1) • Construction Of Conduits (Total Of 3): It Is Necessary To Construct 1 Conduit Under The Road And 2 Under The Railway In Accordance With The Cable Laying Plans For The Bube Kiskőrös-Kalocsa Branching Direction. (According To The Technical Description) • Covering And Protection Of Cable Trenches: 1,500 Running Meters Phase Ii/B (Completion Deadline: Sap According To The Customer): • Axle Counter Occupancy Detection Elements (Spare) According To Technical Content: Installation Of Axle Counter Equipment (According To Plans): 1 Set (The Request For Offer Set Means The Following: ..................... ) • On-Site Barrier Stand Replacement. Replacement Of The Barrier Control Cabinet Stand: 1 Pc. • Cable Installed In Stage Ii/A
Contact Information
Contact No.
+36 300739722
Email
palotas-arany.virag@mavcsoport.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114055885
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.