|
1. The Subject Of The Order Includes The Execution Of Construction Works Consisting In The Completion Of The Expansion Of The Building Of The Volunteer Fire Department Fire Station Together With The Expansion For The Needs Of The Nursery And The Social Services Center, Part Of The Building Intended For The Needs Of The Nursery, In Accordance With The Attached And Marked Architectural Projections Of The Ground Floor And The First Floor. The Scope Of Work Will Also Include Partial Development Of The Area, In Accordance With The Attached And Marked Pzt Plan. In The Scope Of Construction Works Related To The Building - The Nursery Part, The Contractor Will Be Obliged To Complete The Commenced Works, I.E. Insulation And Finishing Of The Facade (Mesh, Glue, Ground, Structure - Decorative Facade Materials), Roof Sheathing By Installing Sheet Metal, Gutters, Downpipes, Sheet Metal Flashing, Execution Of An External Lightning Protection Installation, Construction Of The Facade Inscription Żłobek, Execution Of Internal And External Works Window And Door Joinery, Installation Of The Ei120 Roller Shutter, Installation Of An Elevator In The Existing Elevator Shaft, Construction Of Internal Partition Walls, Construction Of Electrical Installation With Complete Installation Of Plug Sockets, Lighting, Emergency Lighting And Power Supply For Technical Equipment, Construction Of Water And Sewage Installation With All Approaches To Washbasins, Sinks, Toilet Bowls And Dishwashers, Construction Of The Surface Of The External Terrace Marked On The Architectural Projections Of The First Floor With The Symbol Z.1.T In A Structure Enabling The Installation Of Playground Equipment Without Disturbing The Ceiling Structure, With The Possibility Of Discharging Rainwater Into The Designed Downpipes, Taking Into Account The Terrace Layers In Accordance With The Revision Attached To This Procedure, Construction Of A Connector On The External Terrace, Marked On The Architectural Plan Of The First Floor With The Symbol Z.1.12, In A Structure Consistent With The Assumptions Of The Design Documentation, Construction Of Railings On The Indicated External Terrace, Execution Of A Ventilation System Supply And Exhaust With Heat Recovery And Mechanical Exhaust Ventilation From Hygienic And Sanitary Rooms, Construction Of A Gas Installation, Construction Of A Staircase Smoke Extraction Installation In Accordance With The Design Assumptions, Construction Of A Boiler Room With Complete Infrastructure - In Accordance With The Assumptions Of The Design Documentation, Construction Of A Heating Installation, Including A Radiator Installation And An Underfloor Heating Installation, Construction And Processing Of A Flue Gas Duct Located On The External Terrace, Marked On Architectural Projections Of The First Floor With The Symbol Z.1.T, Including Technological Passages Through Marked Fire Zones, Execution Of Missing Internal And External Door Joinery, Execution Of Floors In The Full Structure,
|