Electrical Power Systems Design Services – Implementation Of A Renewable Control Center. Complex Implementation Of A Small Power Plant Control Center (Virtual Power Center), Which Is Suitable For Aggregating, Controlling And Regulating Renewable Energy Generating Small Power Plants And Energy Storage Units. The Goal Of Mvm Onenergy Zrt. Is To Create A Control Center For Small Power Plants Based On Renewable Energy, In Which It Integrates Renewable Electricity Generating Units And Battery Electricity Storage, And Which Operates In Parallel With Its Control Center, Which Has Been Operating Since 2014. The Megujuló Szabályozó Központ Would Provide Aggregator Services To Renewable Energy-Based Production And Storage Units Within And Outside The Mvm Group, Including Scheduling And Control, As Well As Participation In The Auction For The Procurement Of System-Level Services Organized By Mavir Zrt, As Transmission System Management Licensee (Hereinafter: System Operator). The Primarily Targeted System-Level Services Market Segment Is The So-Called Afrr5 (Automatic Frequency Restoration), Secondarily The So-Called Trading Of Mfrr12.5 (Manual Frequency Restoration Reserve) Products. Main Tasks And Expectations Related To Mszk - Control Of Integrated Energy Production/Storage Units Based On Sales Data, Preliminary Market Schedules And Other External Control Signals - Ensuring Continuous (High Availability, Geo-Redundant) Data Connection And Data Connection Communication Between The Onenergy Portfolio Manager And The Primary And Secondary Plant Management Systems Of Mavir Zrt. The Connection Must Comply With The Valid, Relevant Regulations Of Mavir Zrt., Including The Regulations For Connecting To The Mari And Picasso It Platforms. - Providing Online Continuous (0-24) Two-Way Data Connection With Onenergy Meteo And Other It Systems For The Most Accurate Scheduling Of Renewable Power Plants - Online, Redundant Continuous Data Connection With Production Or Storage Units For Monitoring And Logging Current Production Data Further Detailed Tasks In The Technical Description. Quantity: Framework Amount: Huf 500,000,000 Net. The Bidder Is Not Obliged To Draw Down The Framework Amount Either In Whole Or In Part, As It Does Not Have Any Purchase Obligations Undertaken In Advance Based On The Planned Framework Agreement. 321/2015. (X. 30.) Article 46 (3) Of The Cr. Based On The Reference To A Thing Of The Make Or Origin Specified In The Public Procurement Documentation, Or To A Specific Procedure That Characterizes The Products Of A Given Economic Operator Or The Services Provided By It, Or To A Trademark, Patent, Activity, Person, Type, Or A Given Origin Or Production Process, The Term Or Equivalent Must Also Be Understood. It Is Ats Task To Prove Equivalence. A More Detailed Description Is Included In The Draft Framework Agreement And The Technical Description. In The Second Stage Of The Procedure (Article 105, Paragraph (1) Point C) Of The Code Of Civil Procedure, The Specific Payment Is Made By Concluding A Contract Following A Written Consultation.
Contact Information
Contact No.
+36 208499806
Email
kocsis.krisztina@mvm.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113788714
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.