|
Bids Are invited for Facility Management Service - Outcome Based - Deployment Of Man Power , Painting Work In Hvac System , Servicing Of Ahus , Servicing Of Vfd, Pan Humidifier, Plc, , Servicing Of Cooling Tower , Supply Of Various Type Roller Bearing , Supply Of Butterfly Valve 125Mm , Supply Of Ms Pipe 150Mm , Supply Of Butterfly Valve 150Mm , Supply Of Ms Pipe 125Mm , Fabrication,Supply Of Duct , Robotic Vac Duct Cleaning For Ac System , Servicing Of Primary Chilled Water Pumps , Servicing Of Secondary Chilled Water , Sericing Of Condensor Water Pumps Set , Shift O&M Of 33 Kv Sub-Station/Lt Mccs , Maintenance Of Electrical System In Pmi , Supply Of 20W Led Batten , Supply Of 16A Modular Socket , Supply Of 16/20A 3 Pin Plug , Supply Of 16A 1 Way Switch Modular Piano , Lt Motor(<=2.2Kw)-Rewdg , Lt Motor(>2.2-5.5Kw)-Rewdg , Lt Motor(>5.5-18.5Kw)-Rewdg , Solar Plant Maintenance , Filteration Of Transformer Oil , Supply Of Transformer Oil , Decorative Lighting Of Pmi Building , Supply Of 20/22 W Led Bulb , Hiring Of Loading Vehicle , Supervisior (Mandays) - As And When Required , Electrician Technical (Mandays) - As And When Required , Cmcs Of 1.5 Ton Ac , Cmcs Of 1.0 Ton Ac , Cmcs Of 2.0 Ton Ac , Cmcs Of 1.5 Ton Window Ac , Cmcs Of 4.0 Ton Ac , Cmcs Of Water Coolers , Cmcs Of Deep Freezers , Repair Of 1.0 Ton Compressor , Repair Of 1.5 Ton Non-Inverter Compressor , Repair Of 2.0 Ton Non-Inverter Compressor , Replacement Of Condenser Coil In 1.0 Ton/ 1.5 Ton/ 2.0 Ton Split Ac , Replacement Of Cooling Coil In 1.0 Ton/ 1.5 Ton/ 2.0 Ton Split Ac , Replacement Of Condenser Coil In 1.0 Ton/ 1.5 Ton/ 2.0 Ton Window Ac , Replacement Of Cooling Coil In 1.0 Ton/ 1.5 Ton/ 2.0 Ton Window Ac , Dismantling, Shifting And Re-Installation Of Split Ac , Dismantling, Shifting And Re-Installation Of Window Ac , Providing & Fixing Of Refrigerant Copper Pipe With Insulation , Providing & Fixing Of Refrigerant Copper Pipe With Insulation , Providing & Fixing Of Condenser Unit Wall Mounting Stand , Repair Of 1.5 Ton Inverter Compressor , Repair Of 2.0 Ton Inverter Compressor , Shift O&M Of Fire System , Service For Upkeeping Of Jockey Pump , Service For Upkeeping Of Ac Pump , Service For Upkeeping Of Diesel Pump , Paint Of Fire Fighting Equipments , Repair Of Water Line Leakage , Refilling Of Co2 Gas 2 Kg Fire Extingui , Refilling Of Co2 Gas 4.5 Kg Fire Extin , Refilling Of Co2 Gas 22.5 Kg Fire Exitn , Refilling Of Mechanical Foam 9 Ltr. , Refilling Of Dcp 2 Kg Capacity , Refilling Of Dcp 50Kg Capacity , Refilling Of Foam Type Fire Extin 50Kg , Refilling Of Foam Type Fire Extin 9Kg , Refilling Of Water Type Fire Extin 9Ltr , Refilling Of Abc Type Fire Extin 5 Kg , S. Of Rrl Fire Hose Pipe Is 636 , S. Thermoplastic Fire Hose Reel Tub 20Mm , S. Of First Aid Fire Hose Reel Swinining , S. Of Foam Type Exting 50 Ltr. , S. Of Dcp Type Exting 50 Kg. , S. Of Sand Bucket 9 Kg , S. Of Stand For 4 Bucket With Top Cover , S. Of Non Addressable Smoke Dectector , S. Of Non Addressable Heat Dectector , S. Of Analogue Addressable 4 Loop Fire Alarm Control Panel-Ravel/Avani Model , S. Of Addressable Loop Card Of Ravel/Re-Lc Model , S.Addressable Smoke Detector With Base Of Ravel Make , S.Addressable Heat Detector With Base Of Ravel Make , S.Addressable Manual Call Point Of Ravel Make , S. Addressable 2 Loop Panel Of Gst/Gst200n-1 Model , S.Addressable Smoke Detector With Base Of Gst/Di-9102E+Db-01 , Hydrotesting Co2 Ext. Cap. Of 2/4.5/22.5 , Hydro Testing Abc/Dcp Ext.Cap. Of 2/5 Kg , Replacement Of Non Addressable Fire Control Cum Alarm Panel With Lifier , Deployment Of Facility Manager
|