|
Bids Are invited for Operation And Maintenance Of Electro-Mechanical Installations - Complete System - Annual Comprehensive Maintenance Contract Of Following Capacity & Type Single/Three Phase, Wall/Ceiling Mounted Split Type Ac Units With Stablizer (Wherever Installed) Of All Makes Installed At Different Locations In Airport Including Providing Of All Necessary Consumable Items & Spares , Compressors ( As Per Item), Refrigerent Gas, Burn Out/Worn Out Parts I/C Replacemnt Of Nitrile Insulation Of Refrigerent Piping, Pcb, Blower Fan /Motor, Coil(Evp./Condenser), Etc. Complete As Required As Per Special Conditions Of Contract (This Item Includes Deployment Of Manpower As Per Tender Scc Condition-11 To Keep 100% Servicability All The Time) , 1.5/2 Ton Split Type (1-Ø,50Hz) (With Compressor) (84Nos.X 24 Months = 2016 Jobs.) , 1.5/2 Ton Split Type (1-Ø,50Hz) (Compressor Under Gurarantee ) (20Nos.X 20 Months = 400 Jobs.) , 3 Ton Split Type (3-Ø,50Hz) (With Compressor) (2 Nos.X 24 Months = 48 Jobs.) , 3/3.5 Ton Cassette Type (3-Ø,50Hz) (With Compressor) (4 Nos. X 24 Months = 96 Jobs.) , 3/3.5 Ton Cassette Type (3-Ø,50Hz) (Compressor Under Gurarantee ) (2 Nos. X 20 Months = 40 Jobs.) , 3/3.5/4 Ton Tower Type (3-Ø,50Hz) (With Compressor) (24 Nos. X 24 Months = 576 Jobs.) , 3/3.5/4 Ton Tower Type (3-Ø,50Hz) (Compressor Under Gurarantee ) (15 Nos. X 20 Months = 300 Jobs.) , Annual Comprehensive Maintenance Contract Of Water Coolers Units Of Following Capacity Of All Makes Installed At Different Locations In Airport Including Providing All Necessary Consumable Items & Spares, Compressor, Cleaning Etc & Keeping The Water Quality & Cleaning Record & Display At The Water Cooler By Keeping Maintenance Card Etc. Complete As Required As Per Special Conditions Of Contract. (This Item Includes Deployment Of Manpower As Per Tender Scc Condition-11 To Keep 100% Servicability All The Time) , Up-To Capacity Of 60/120 Ltrs Water Cooler (20 Nos. X 24 Months= 480 Job) , Annual Comprehensive Maintenance Contract With Monthly Routine Service Visit Of R.O. System Of Of Following Capacity (Wherever Installed At The Airport) Including Supply & Replacement Of Power Supply Adaptor Pre/Post-Filter Candle, Activated Carbon, Sediment Filter, Membrane, Ro Pump & Other Associated Accessories Etc And Any Other Defective Part To Maintain The Required Quality & Rated Flow Of Treated Water With Water Level Controller Integrated With Water Cooler . It Also Includes Testing Of Water Quality Of All The Water Coolers At The Quaterly Frequency As Per Relavent Norms Of Potable Drinking Water. (This Item Includes Deployment Of Manpower As Per Tender Scc Condition-11 To Keep 100% Servicability All The Time) , 25 Lph Ro Unit (25 Nos. X 24 Months = 600 Job) , Carrying Out / Making In-Field Measurement/Testing Of Intensity, Beam Spread/Coverage, Orientation, Chromaticity, Luminous Factor, Setting Of Field Alignment, Toe-In Angle, Elevation Angle As Per The Requirement Of Site & Icao/Civil Aviation Requirement (Car) Section-4 Aerodrome Standard & Licensing Series ‘B Part-I, For Inset/ Elevated Type Approach, Runway Edge, Runway End, Threshold, Papi Airfields Ground Lights, By Using Vehicle Mounted Mobile Testing Equipment System / Frame Reader, Submission Of Test Reports Including Re-Testing Of Complete System After Replacement Of Defective Components Found By Aai While Photometry, Like Filter/Prism, Lens (Inner & Outer), Reflector, L Holder, L Etc By Carrying Out In-Field Measurement Of Intensity, Beam Spread/Coverage, Orientation, Chromaticity, Luminous Factor, Setting Of Field Alignment,Toe-In Angle, Elevation Angle Of Airfields Ground Lights Etc. Complete As Required To The Satisfaction Of Engineer-In-Charge.Note :-1) Please Refer Detailed Inventory Of Glf In Tender At Table -Vi.2)On Photometry, If Maintenance Factor (Candela)/Color Chromaticity Is Found Less Than Dgca/ Icao Standards, Then Appropriate Corrective Action Such As Proper Cleaning/ Replacement Of Defective Components Like Filter, Lens (Inner & Outer), Reflector, L Holder, L , Etc. Shall Be Taken By Aai To Maintain The Minimum Accepted Standards.3) Time Required To Carry Out The Replacement Of Defective Components May Very Approx. 2-3 Days Depending On Runway Availibity, Quantum Of Work Or Weather Conditions, Accordingly, Agency Shall Plan The Testing Schedule.
|