|
Tender for Installation Of 100 Kva Additonal Tf In B.Plan 2026-27 Scheme At Various Site Of Edd-I Hapur, Under Edc Hapur (10 No. Work) (Dpr N0. 106, 108, 109, 110, 111, 112, 113, 114, 115 & 116 ) , Safe Carriage Of Departmental Materials From Electricity Store Centre At Hapur / J.E. Store To The Site Of Work, Including Loading And Unloading At Both Ends. The Work Shall Be Executed Over Kachha And Pakka Roads As Per The Directions Of The Site In-Charge. The Scope Includes Arrangement Of Suitable Transport, Labour For Loading/Unloading, And All Necessary Tools & Plants (T&P). The Lead Distance Shall Be Up To 0-50 Km, Covering Stores Located At Hapur / Ghaziabad / Bulandshahr. , Plain Cement Concrete Pole 11.0M Long , 11/0.440 Kv 100 Kva Dt , Acsr Weasel Conductor , Lt Ab Cable 3X120+1X95+1X16 Sqmm , Lt Ab Cable 3X95+1X70+1X16 Sqmm , Lt Pvc Alu. 3.5X150/70 Sqmm , 11Kv Polymeric Pin Insulator With Pin , 11Kv Disc Insulator T&C Type 45 Kn With Fitting , Earthing Complete , Stay Rod , Stay Wire 7/10 Swg. , Erection And Fixing Of Double Pole Structure For Plain Cement Concrete Pole 11 Mtr 11Kv Ht Line Including Excavation Of Suitable Size Pits, Providing And Fixing Of Shackle Insulators, And Complete Installation Of All Requisite Accessories Strictly As Per Respo Drawings/Standard Norms; Including Providing And Fixing Of Holding Clamps Made Of M.S. Flat Of Size 35×5 Mm With Suitable Nuts & Bolts, Alignment, Tightening And All Allied Works; The Scope Of Work Includes Cost Of All Labour, Tools & Plants (T&P), Machinery, Drilling/Excavation, Safety Arrangements, Protection Of Existing Utilities, Formation Of Pits, And Complete Site Restoration; The Contractor Shall Also Be Responsible For Obtaining All Necessary Permissions, Resolving Right Of Way (Row) Issues, And Completing The Work As Per Departmental Standards And Directions Of The Engineer-In-Charge. , Grouting Of Plain Cement Concrete Pole 11 Mtr Supports In cement concrete 1:4:8 (Cement, Sand & 40 Mm Brick Ballast) In Block Size 450×450 Mm Up To 1/6Th Depth Of Full Length Of Support Below Ground Level And 300 Mm Above Ground Level (Plinth), Using cement concrete 1:4:8 (Cement, Coarse Sand And Stone Grit) Including Mufting As Per Approved Drawing; The Work Shall Include Excavation, Backfilling, Proper Ramming, And Curing Complete In All Respects With All Required Materials; The Scope Further Includes Cost Of All Labour, Tools & Plants (T&P), Machinery, Drilling/Excavation, Safety Arrangements, Protection Of Existing Utilities, And Complete Site Restoration; The Contractor Shall Also Be Responsible For Obtaining Necessary Permissions, Resolving Right Of Way (Row) Issues, And Executing The Work As Per Departmental Standards And Directions Of The Engineer-In-Charge. , Providing And Fixing Of M.S. Channel 100X50x5mm And M.S. Angle 65X65x6mm Complete In All Respects, Including Proper Mounting, Alignment And Tightening With All Required Accessories, Strictly As Per Respo Drawings/Standard Norms And Directions Of The Site In-Charge; The Scope Of Work Includes All Labour, Tools & Plants (T&P), Handling, Installation, Safety Arrangements And All Allied Works Necessary For Proper Completion Of The Work As Per Departmental Standards And Directions Of The Engineer-In-Charge. , M.S. Channel 100X50x5mm , M.S. Angle 65X65x6mm , Providing And Fixing Of All Types Of Double Pole Clamps Including, Holding Clamps, Top Channel Clamps, Dropper Channel Clamps Etc., Along With Suitable Nuts & Bolts, Complete In All Respects Strictly As Per Respo Drawings/Standard Norms And Directions Of The Site In-Charge; The Scope Of Work Includes All Labour, Tools & Plants (T&P), Handling, Installation, Alignment, Tightening, Safety Arrangements And All Allied Works Necessary For Proper Completion Of The Work As Per Departmental Standards And Directions Of The Engineer-In-Charge. , Providing And Fixing Of Follwings Petty Meterial As Per As Per Respo Drawings/Standard Norms And Directions Of The Site In-Charge; The Scope Of Work Includes All Labour, Tools & Plants (T&P), Handling, Installation, Alignment, Tightening, Safety Arrangements And All Allied Works Necessary For Proper Completion Of The Work As Per Departmental Standards And Directions Of The Engineer-In-Charge. , Suspension Clamps , I-Hook , Peircing Connector , Barbed Wire , 11 Kv Danger Board , Providing & Fixing Of Lt Fuse Set Protection Unit For 100 Kva Dt With Smc Box Including Fixing Of All Accessories By Providing All Required Materials (Like Suitable Nuts & Bolts Etc.) As Per Respo/Drawing Norms And As Per Direction Of Site Incharge. , Erection & Fixing Of 11Kv D.O. Fuse Set Protection Unit For 100 Kva Dt Including Fixing Of All Accessories By Providing All Required Materials (Like Suitable Nuts & Bolts Etc.) As Per Respo/Drawing Norms And As Per Direction Of Site Incharge. , Safely Installation Of 11/0.440 Kva 100 Dt With The Help Of Crane/Manual Labour At Lt Sub-Station Double Pole By Providing Proper Size Aluminium Long Barel Lug For Ht/Lt As Per Direction Of Site Incharge. , Laying Of Lt Abc 3X120+1X95+1X16 Sqmm Using Suspension Clamps, I-Hook And Dead End Clamp Inculding Jumpering Work With Peircing Connector, Cable Connection With Distribution Box For Proper Completion Of Work As Per Respo Norms, And As Per Direction Of Site Incharge. , Laying Of Lt Abc 3X95+1X70+1X16 Sqmm Using Suspension Clamps, I-Hook And Dead End Clamp Inculding Jumpering Work With Peircing Connector, Cable Connection With Distribution Box For Proper Completion Of Work As Per Respo Norms, And As Per Direction Of Site Incharge. , Erection And Laying Of Lt Pvc Al 3.5X150/70 Sqmm Inculding Proper Connection With Long Barrel Lug, Proper 3 Nos Crimping On Each Lug, Lt Fuse Set/Smc Box For Proper Completion Of Work As Per Respo Norms, And As Per Direction Of Site Incharge. , Fixing And Grauting Of Stay Rods (16X1800)Mm Including All Work Of Excavation, Cement Concrete In Size (0.60X0.60X0.30)M In Ratio 1:4:8 Cement, Sand, 40Mm Brick Ballast As Per Drg. Including Back Filling, Proper Ramming Etc And Fixing Tightening & Nozzling Of Stay Wire With Stay Rod With The Poles Of Required Tension As Per Drawing As Per Respo Drawing/Norms By Providing All Grouting Material And Stay Clamp Made Of M.S. Flat Of Size 50X6mm With Proper Size Bolts & Nuts & Loops, Includes All Labour, Tools & Plants (T&P), Fabrication, Fitting, Alignment, Tightening, Safety Arrangements And All Allied Works And Materials Will Be Provided By Contractor, As Per Departmental Standards And Directions Of The Engineer-In-Charge. Only Stay Set And Stay Wire Will Be Provided By Department. , Providing And Fixing Of Stone Pad Complete In All Respect, Including Supply Of Approved Quality Stone Pad, Necessary Excavation, Dressing, Leveling, Proper Positioning, Packing With Sand/Soil, And All Labour, Tools, Plants, And Materials Required For Satisfactory Completion Of Work As Per Departmental Specifications And Directions Of Engineer-In-Charge. , Providing And Fixing Of G.I. Strip Of Size 50 Mm × 6 Mm For Connection Of Transformer, Including Cutting, Bending, Drilling, Welding/Bolting, Clamping, And Proper Jointing With Required Nuts, Bolts, Washers, Clamps, And All Necessary Materials, Labour, Tools & Plants For Complete And Satisfactory Execution Of Work As Per Departmental Specifications And Directions Of Engineer-In-Charge. , Earthing Of Supports And Neutral Of Dt With Ms Earth Rod Of (20X2540)Mm Long Including Excavation Of Pit And Driving M.S. Rod 3.0 M Apart From Support And 0.5M Below The Ground Level And Connection Below The Earth Electrodes With The Help Of G.I. Wire & Earthing Lugs, Nut And Botls As Per Respo Drawing/Norms Includes All Labour, Tools & Plants (T&P), Fabrication, Fitting, Alignment, Tightening, Safety Arrangements And All Allied Works Will Be Provided By Contractor, As Per Departmental Standards And Directions Of The Engineer-In-Charge. Only Earth Rod And Gi Wire Will Be Provided By Department. , Earthing Of Dt In B.Plan 2026-27 Scheme At Various Site Of Edd-I Hapur, Under Edc Hapur (2 No. Work) (Dpr N0. 57 & 58) , Safe Carriage Of Departmental Materials From Electricity Store Centre At Hapur / J.E. Store To The Site Of Work, Including Loading And Unloading At Both Ends. The Work Shall Be Executed Over Kachha And Pakka Roads As Per The Directions Of The Site In-Charge. The Scope Includes Arrangement Of Suitable Transport, Labour For Loading/Unloading, And All Necessary Tools & Plants (T&P). The Lead Distance Shall Be Up To 0-50 Km, Covering Stores Located At Hapur / Ghaziabad / Bulandshahr. , Earthing Rod , Gi Wire 6 Swg , Earthing Of Supports With Ms Earth Rod Of (20X2540)Mm Long Including Excavation Of Pit And Driving M.S. Rod 3.0 M Apart From Support And 0.5M Below The Ground Level And Connection Below The Earth Electrodes With The Help Of G.I. Wire & Earthing Lugs, Nut And Botls As Per Respo Drawing/Norms Includes All Labour, Tools & Plants (T&P), Fabrication, Fitting, Alignment, Tightening, Safety Arrangements And All Allied Works Will Be Provided By Contractor, As Per Departmental Standards And Directions Of The Engineer-In-Charge. Only Earth Rod And Gi Wire Will Be Provided By Department. , Providing, Supplying, And Fixing Of Heavy-Duty Nuts And Bolts Of Approved Make And Grade, Complete With Two Numbers Plane Washers And One Number Heavy-Duty Spring Washer Per Assembly, Conforming Strictly To Relevant Is Specifications And Respo Drawing Norms; Scope Of Work Includes Material Supply, Transportation, Precise Positioning, Alignment, And Rigid Tightening To Specified Engineering Torque Limits On Electrical Structures, Steel Poles, Cross-Arms, Or Substation Equipment, Inclusive Of Rust-Preventive Primer/Paint Coatings Where Required, All Handling Labor, Tools, Tackles, Scaffolding, Staging, Leads, And Lifts At Any Height, Executed Complete In All Respects Under The Strict Direction And Entire Satisfaction Of The Site In-Charge. , Providing And Erection Of Chemical Earthing For Neutral Of Dt With Gi Strip 50X6mm Including Excavation Of Pit And Using Necessary Chemical And Electrode To Obtain Results = 1 Ohm, 3M Apart From Support, Below The Ground Level And Connection Below The Earth Electrodes With The Help Of G.I. Strip 50X6 Mm & Earthing Lugs, Nut And Bolts As Per Respo Drawing/Norms Includes All Labour, Tools & Plants (T&P), Fabrication, Fitting, Alignment, Tightening, Safety Arrangements And All Allied Works Will Be Provided By Contractor, As Per Departmental Standards And Directions Of The Engineer-In-Charge. , Supply And Delivery Of Heavy-Duty 4-Ton Capacity Transformer Handling Trolley (12 X 6) Complete With Tyres, Stabilization Jacks, Mesh Safety Fencing, And Dual Gates As Per Technical Specifications. detail project report 99, 100, 101 , Providing And Safe Delivery Of Heavy-Duty Transformer Handling Trolley Complete In All Respects As Per Approved Specifications And Directions Of Engineer-In-Charge. The Trolley Shall Be Fabricated With Overall Outer Dimensions Of 12 Feet Length × 6 Feet Width Using Heavy-Duty M.S. Structural Sections And Designed For Minimum Load Carrying Capacity Of 4 Tons Without Bending, Deformation, Or Structural Failure. The Platform Shall Have Minimum Structural Depth Of 6 Inches Fabricated With Heavy-Duty M.S. Plates Supported On Rigid Internal Frame Suitable For Handling Static And Dynamic Transformer Loads During Lifting, Shifting, Transportation, And Storage. The Trolley Shall Maintain Uniform Minimum Ground Clearance Of 3.5 Feet From Bottom Of Main Frame To Ground Level And Shall Be Provided With Side Retaining Walls Of Minimum 32 Inches Height Above Platform Level. Complete Safety Fencing Of 6 Feet Height Fabricated With Alloy M.S. Mesh Securely Welded To Structural Frame Along With Continuous 0.5-Foot M.S. Angle Reinforcement At Top Perimeter Shall Be Provided On All Four Sides. One Front Gate And One Rear Gate Each Of Minimum 6 Feet Width Complete With Heavy-Duty Hinges And Locking Arrangement Shall Also Be Provided For Loading And Unloading Purposes. The Main Longitudinal Frame Members Shall Be Fabricated Using 100 Mm × 50 Mm M.S. Channels And Cross Members Using 75 Mm × 40 Mm M.S. Channels Placed At Suitable Spacing For Uniform Load Distribution. The Trolley Shall Be Complete With Axle And Wheel Assembly Comprising Two Nos. Heavy-Duty 65 Mm Dia Steel Axles, Four Nos. Tyres Size 7 × 50 × 16, Four Nos. Heavy-Gauge Steel Rims Size 7 × 50 × 16, Heavy-Duty 36-Inch Bearing Arrangement, And Four Nos. Jack Punches With Chudi Size 12 × 50 Mm Dia At Each Corner For Stabilization During Loading And Unloading Operations. All Fabrication Work Shall Be Carried Out With High-Quality Arc/Co2 Welding And All Joints Shall Be Properly Finished, Ground Smooth, And Free From Cracks, Porosity, And Defects. The Complete Structure Shall Be Cleaned Thoroughly And Painted With One Coat Of Red Oxide Primer Followed By Two Coats Of Approved Industrial Enamel Paint. All Materials Including M.S. Plates, Channels, Angles, Mesh, Tyres, Rims, Bearings, And Welding Consumables Shall Be Brand New And Conform To Relevant Is Specifications. The Completed Trolley Shall Be Inspected By Competent Authority And Any Defects Shall Be Rectified By Contractor At No Extra Construction The Rate Shall Include Cost Of All Materials, Labour, T&P, Fabrication, Fitting, Welding, Painting, Transportation, Loading, Unloading, Testing, Inspection, And Delivery Complete In Ready-To-Use Condition. Unit: Each (No.).
|