|
1) The Subject Of The Order Are Construction Works Related To The Reconstruction Of The External Sanitary Sewage Network And The Reconstruction Of The Internal Under-Floor Sewage System And The Internal Wall-Mounted Sewage System, Together With Accompanying Works On The Premises Of The Facility And In The Basement Of The Building - Iv Department Of Municipal Nurseries In Gliwice At Ul. Kozielska 71. Planned Design Works Include: A) Reconstruction Of The Existing Ks02-B2 Sanitary Sewage System. Including: Replacement Of Sewage Pipes, Profiling Of The Canal Slope Without Changing The Sewerage Route, B) Decommissioning Of The Second Existing Sanitary Sewerage Sewer Ks01-B1, However, The Sewer Will Remain Built Up, But The Rebuilt Underfloor Sewage System Will Not Be Connected To It, C) Reconstruction Of The Entire Underfloor Sanitary Sewage System In The Basement Of The Building, Also Including: - Installation Of Revisions On The Existing Sanitary Sewage Risers And Construction Of A Trapper Type Passage (Cast Iron-Pvc) At Connections To Existing Cast Iron Risers, - Installation Of Designed Floor Drains With Mechanical And Water Anti-Odour Closure, E.G. Type Hl310prblue By Hutterer&Lechner - Connection Of Existing Washing Machines, Bathtub And Dirt Trap With Siphon And Other Sanitary Facilities, - Installation Of A Cast Iron Drain With A Cooling Well In The Heat Distribution Room - Pec Switchboard (0.1.6). - Reconstruction Of The Existing Suspended Sewage System In The Drying Room (0.2.1), Consisting In Disconnecting It From The Pk05 Riser And Connecting It Directly To The Under-Floor Installation, As Well As Reconstruction Of The Wall-Mounted Sewage System. The Works Should Be Carried Out In Accordance With The Design Documentation, Issued Decisions, Arrangements, Regulations, Standards, Principles Of Technical Knowledge. The Facility Is An Active Nursery Facility - The Contractor Should Carry Out Works In Such A Way That The Facilitys Uninterrupted Operation Is Maintained. Note: Any Complete Exclusion From The Use Of The Sewage Network (Disconnection Of Sanitary Receivers) May Only Take Place In The Period From July 25, 2026 To August 6, 2026.2) The Contractor, Additionally, As Part Of The Implementation Of The Subject Of The Order And Within The Offered Price: - Will Develop A Project For The Organization Of Works With The Bioz Plan And Present It To The Ordering Party For Approval, - Will Cover The Costs Of Water And Electricity Consumption In The Amount A Flat-Rate Fee Of Pln 500 Gross, - Will Maintain Order And Perform Cleaning Works On An Ongoing Basis, Including Keeping Paved Surfaces Clean - Will Cover All Costs Required By: Offices, Institutions, Owners Of The Land Infrastructure Network, Will Commission And Cover The Costs Of Supervision Of The Owners Of The Land Infrastructure - Will Execute, At Its Own Expense, The Provisions Of The Agreement Letters, Including The Letters Of: Przedsiębiorstwo Wodociągów I Kanalizacja Gliwice (Pwik), - W
|