|
The Subject Of The Order Is: Expansion Of The Municipal Library Building For The Purpose Of A Tourist Services Center In The Żyrzyn Commune Location: Żyrzyn, Commune. Żyrzyn, Plot No. 776, District: 0015 Żyrzyn, Registration Unit: 061411_2 Żyrzyn, Poviat Puławski, Province Lubelskiea. The Scope Of The Order Includes, Among Others: − Notification To The Office Of The Commencement Of Construction Works. − Securing The Construction Site And Organization Of The Construction Site. − Expansion Of The Municipal Library Building, − Construction Of A Garbage Shelter. − Construction Of Designed Walkways And Access Roads Made Of Paving Stones, − Construction Of Parking Spaces, − Insulating Greenery, − Small Architecture, − Cleaning Works, − Notification To The Office Of Completion Of Construction Works And Obtaining A Permit For The Planned Use Installations: − External Sanitary Sewage Installation – Designed For The Existing Sewage Manhole Along With The Reconstruction And Liquidation Of A Part Of The Installation, − External Water Supply Installation, − External Rainwater Drainage Installation, − External Wlz Pre-Calculated Energy Installation, − External External Lighting Energy Installation, − Internal Water And Sewage Installation, − Internal Central Heating Installation, − Internal Electrical Installation, − Telecommunications Installation, − Photovoltaic Installation With A Capacity Of 27.0 Kwp, − Lightning Protection Installation, − Ventilation Installation, − Air Conditioning Installationb. Technical Parameters Of The Building − Building Area – 394.91 M2 − Total Area – 394.91 M2 − Usable Area – 325.74 M2 − Cubic Capacity – 2192.65 M3 − Building Length – 33.48 M − Building Width – 16.99 M − Building Height – 7.84 M − Number Of Storeys: 11. Order Should Be Performed In Particular In Accordance With The Design Documentation, Technical Specification For The Execution And Acceptance Of Works And Other Documents Constituting Annex No. 10 To The Swz, Taking Into Account The Provisions Of The Swz And The Contract (Annex No. 9 To The Swz).2. A Detailed Description Of The Subject Of The Order Includes In Particular: 1) Design Documentation, 2) Technical Specification For The Execution And Acceptance Of Construction Works. 3) Additionally, Bill Of Quantities For Works. 3. The Subject Of The Order Must Be Performed In Accordance With Applicable Legal Provisions, In Particular The Act Of July 7, 1994, Construction Law (Consolidated Text: Journal Of Laws Of 2026, Item 524), Together With Implementing Regulations, Standards And Instructions Of Manufacturers Of The Equipment And Materials Used, Principles Of Technical Knowledge And Construction Skills, Under The Supervision Of The Ordering Partys Representatives - The Investor Supervision Inspector And The Ordering Party Itself.4. The Subject Of The Order Should Be Performed With The Participation Of Persons With Appropriate Qualifications And Experience. (Industrial Works Managers)5. The Materials Provided And Us
|