Quotation are invited for Overhauling of PH-1 Boiler Feed Water Pump (FWP) of G Station - 2027-2028. OVERHAULING OF PH-1 BOILER FEED WATER PUMP (FWP) OF G STATION -2027-2028 PUMP DETAILS:MODEL: WKF- 150 / 3, NO OF STAGES-3SL. NO.: 7-P 21-171-569/1~3. 7-P21-171-875/1~3.FLOW: 360 M3/HR, MIN FLOW: 80.0 M3/HR, TEMP. MAX-120 CDISCHARGE PRESSURE. - 32.2 BAR, SUCTION PRES SURE-3.1 BARRPM-2988, RECOMMENDED MOTOR POWER: 450 KWYEAR OF MANUFACTURE-1992MAKE: KSB.QTY-2 NOSSCOPE OF WORK FOR VENDOR:1.#MOBILIZA TION/DEMOBILIZATION OF PEOPLE AND MATERIALS. VENDORS NEED TOAPPLY FOR ENTRY PERMIT IN ADVANCE2.#RISK ASSESSMENT AND WORK METHOD STAT EMENT TO BE SUBMITTED.3.#TOOLBOX TALK TO BE GIVEN TO THE CONTRACTOR PEOPLE ON DAILY BASIS.4.#PRE-DISMANTLING ALIGNMENT READINGS TO B E RECORDED.5.#DISASSEMBLY OF PUMP SUCTION AND DISCHARGE FLANGE AND PIPELINES.REMOVAL OF AUXILIARY CONNECTIONS/PIPELINES/INSULATION. DECOUPLING OFMOTOR6.#REMOVAL OF THE PUMP FROM PUMP BASE (RIGGING WORK)/DISMANTLE ANDTRANSPORTING THE PUMP/PARTS TO VENDOR WORKSHOP WITH PROPERTRANSPORTATION.7.#KEEP RECORD/PHOTOGRAPHS OF EACH PART AT THE TIME OF DISMANTLING.8.#GRIT BLASTING OF MAJOR COMPONENTS WITH PROPER MASKING (IFNECESSARY).9.#NDT OF PARTS.10.#RUN OUT PROTOCOL, CLEARANCE PROTOCOL TO BE SUBMITTED11.#SUBMISSION OF DETAILED PHOTOGRAPH, INSPECTION REPORT WITH SPAREPARTS REQUIREMENT.12.#BALANCING OF THE COMPLETE ROTOR ASSEMBLY / INDIVIDUAL PARTS TO ISOGRADE.13 .#MACHINING/SKIM MACHINE OF WEAR RINGS, IMPELLER WEAR RING, O RINGGROUPS OR ANY OTHER PUMP PARTS14.#BUFFING/GRINDING OF WEAR RINGS, IMPELLER WEAR RING, O RING GROUPSOR ANY OTHER PUMP PARTS15.#METAL BUILD UP BY HOT WORK AND GRINDING/MACHINING FINISH FOR ANYPUMP PAR TS16.#FIXING OF WEAR RINGS (IF REQUIRED)17.#STRAITENING OF SHAFT-NEW/REFURBISHED (IF REQUIRED)18.#ASSEMBLY OF THE PUMP WITH NEW/EXIS TING/REFURBISHED PARTS-PROVIDEDBY DEWA BASED ON INSPECTION REPORT.19.#O-RINGS, V RINGS, NUT-BOLTS, CIRCLIPS, BEARINGS, GASKET, COOLI NGLINE PIPES AND PIPE FITTINGS ETC. IF NOT AVAILABLE WITH DEWA THEN ITWILL BE IN VENDOR SCOPE AS REQUIRED.20.#PAINT SIMILAR COLOR AS RECEIVED AND BLIND ALL OPENING PROPERLY.21.#PUMP/INDIVIDUAL PARTS TO BE TRANSPORTED TO DEWA WITH PROPERPACKING.22.#ASSEMBLY/FIXING OF THE PUMP IN LOCATION AND CONNECTING DISCHARGEAND SUCTION PIPELINES AND AUXILIARY CONNECTIONS.23.#COMMISSIONING OF THE PUMP.24.#RE TURN THE OLD MATERIAL MATCHING WITH THE SPARES USED.25.#PUMP OVERHAUL SCHEDULE MAY BE INDIVIDUAL/PARALLEL/SERIES26.#DURATION OF WORK 8(EIGHT) DAYS.27.#SUBMISSION OF OVERHAUL REPORT WHICH COMPLIES WITH DEWA CHECK LIST.VENDOR#S GENERAL RESPONSIBILITY AND LIABILITIES :1.#CONTRACTORS SHALL PROVIDE SUPERVISORY, SKILLED WORKFORCE2.#ONE QUALIFIED SUPERVISOR SHOULD BE AT THE SITE DURING WORK.3.#ALL REQ UIRED TOOLS, SPECIAL TOOLS & EQUIPMENT ETC. REQUIRED TOCOMPLETE THE JOB WITH VALID CERTIFICATE4.#ALL THE LIFTING TACKLES AND TOOLS R EQUIRED FOR THE WORK TO BEBROUGHT BY VENDOR AND IT SHALL BE WITH VALID CERTIFICATION.5.#ALL CONSUMABLES AND ANY OTHER MATERIAL REQUI RED TO COMPLETE THE WORK6. Qty: 2 G Station Ph-1 FWP Overhaul STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601207)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113369549
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.