Monitoring And Control Services – Technical Supervision Of Geological Research Ii.. The Amount Available To The Bidder Is Huf 117,977,045 Net, Of Which The Bidder Undertakes To Draw Up To 75%. The Mandated Task Is The Continuous On-Site Monitoring, Control And Supervision Of The Works Of The Executing Contractors With The Aim Of: Whether The Contractors Performing The Execution Work Comply With The Requirements Prescribed In The Operational Plans And/Or Instructions, Legislation, Official Decisions, Inspection Protocols, Construction And Authorization Documentation, Or Whether They Comply With Their Subcontractors And Suppliers; The Client Should Be Informed About The Status Of The Execution Of The Contract For The Execution Of Construction Work; The Client Can Make Sure That The Construction Work Is Carried Out In Sufficient Quality And By The Prescribed Deadline, Whether The Action Plans Taken To Deal With The Revealed Non-Conformities Are Fully Implemented. Details Of The Technical Supervision Activity: Technical Supervision Work Related To Kkát: - Technical Supervision Of Field Activities (E.G. Core Drilling Work, Hydraulic On-Site Tests) - 20 Shifts - Field On-Site Inspection Activity (Geophysics) - 5 Shifts - Professional Supervision Activity (Geophysics) - 5 Engineering Days - Professional Cooperation Related To Technical Supervision - 10 Engineering Days (As Part Of The Task, Among Other Things, Summary Preparation Of A Final Supervision Report Is Required, Which Can Only Be Carried Out With The Authorization Of A Geological Expert) Technical Supervision Works Related To Nrht: - Technical Supervision Of Field Activities (E.G. Core Drilling Works, Hydraulic Site Tests) – 45 Shifts - Professional Contribution Related To Technical Supervision – 5 Engineering Days (As Part Of The Task, Among Other Things, It Is Necessary To Prepare A Summary Final Supervision Report, Which Can Only Be Carried Out With The Authorization Of A Geological Expert) Technical Supervision Related To Naht Research Supervisory Work: - Technical Supervision Of Field Activities (E.G. Core Drilling Work, Hydraulic On-Site Tests) - 350 Shifts - Professional Supervisory Activity (Geophysics) - 5 Engineer Days - Professional Cooperation Related To Technical Supervision - 35 Engineer Days (As Part Of The Task, Among Other Things, It Is Necessary To Prepare A Summary Final Supervision Report, Which Can Only Be Carried Out With The Authorization Of A Geological Expert) Technical Supervision Related To The Preparation Of The Establishment Of Nkah Storage Works: - Technical Supervision Of Field Activities (E.G. Core Drilling Work, Hydraulic On-Site Tests) - 185 Shifts - Field On-Site Inspection Activities (Geophysics) - 65 Shifts - Professional Supervision Activities (Geophysics) - 30 Engineering Days - Professional Cooperation Related To Technical Supervision - 38 Engineering Days (As Part Of The Task, Among Other Things, It Is Necessary To Prepare A Summary Supervision Report, Which Is Exclusively For Geological Experts Authorized) The Client Undertakes To Draw Up To 75% Of The Total Amount During The Entire Duration Of The Contract. The Principal Is Entitled - Unilateral Declaration Of Rights
Contact Information
Contact No.
+36 75519542
Email
kozbeszerzes@rhk.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113346260
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.