|
1.1 - Localadministrationfront0120260401, 1.1 - Localadministrationfront0220260401, 1.1 - Localadministrationfront0320260401, 1.1 - Localadministrationfront0420260401, 1.1 - Localadministrationfront0520260401, 1.1 - Localadministrationfrente0620260401, 1.1 - Localadministrationfrente0720260401, 1.1 - Localadministrationfrente0820260401, 2.1 - Supply And Installation Of Workplate With Galvanized Sheet Metal And Wooden Structure. Af032022psfrente0120260401, 2.2 - Container Location2, 40 Withoutinternalpartitionsdoesnotincludemobilizationoffrontdemobilization0320260401,Withoutinternalpartitionsdoesnotincludemobilizationoffrontdemobilization0420260401,Withoutinternalpartitionsdoesnotincludemobilizationoffrontdemobilization0520260401, Withoutinternalpartitionsdoesnotincludemobilizationfromfrontdemobilization0620260401,Withoutinternalpartitionsdoesnotincludemobilizationfromfrontdemobilization0720260401,Withoutinternalpartitionsdoesnotincludemobilizationfromfrontdemobilization0820260401, 2.3 - Transportationwithtruckbodywithcapacityof8, 5Twithautocranewithliftingcapacityof5,7T-Pavedroadfront0120260401, 7T-Pavedroadfront0220260401, 7T-Pavedroadfront0320260401, 7T-Paved Highwayfront0420260401, 7T-Paved Highwayfront0520260401, 7T-Paved Highwayfront0620260401, 7T-Paved Highwayfront0720260401, 7T-Rodoviapavimentedafront0820260401, 3.1 - Demolitionofsimpleconcretewithhammerfront0120260401, 4.1 -Mechanicalcompactionofsoilforradier Execution, Concrete Flooringor Slab On The Ground, With Vibrating Plate Type Soil Compactor.Af092021front0220260401, With Vibrating Plate Type Soil Compactor.Af092021front0320260401, 4.2 - Execution Of Interlocking Concrete Floor-Modelopaver, 020X100cm, E8cm, 35Mpa Resistance, Cornaturalfrente0320260401, Cornaturalfrente0420260401, 4.3 - Half-Wire Guide, Inconcretewithfck15mpa, Moldedin-Loco, Section15x45cm, Woodenform, Exclusivegutter, Includingexcavation, Piling And Transport With Removal Of Excavated Material In Front Bucket0120260401, Piling And Transport With Removal Of Excavated Material In Front Bucket0220260401, Piling And Transport With Removal Of Excavated Material In Front Bucket0320260401, 4.4 - Subfloor Straightened With Mortar, Traço1:3Cementandsand, Esp.30Mm, Includingmortarwithmechanizedfrontpreparation0220260401, Includingmortarwithmechanizedfrontpreparation0320260401, Includingmortarwithmechanizedfrontpreparation0420260401, 4.5 - Surface Waterproofing With Acrylic Membrane Polymeric Mortar, 3 Coats.Af092023front0320260401, 3Coats.Af092023front0420260401, 4.6 - Subfloor With Self-Leveling Mortar, Applied On Slab, Adhered, Thickness2cm.Af072021front0320260401, Thickness2cm.Af072021front0420260401, Thickness2cm.Af072021front0520260401, 4.7 - Granite Flooring Applied On Sidewalks Or Outdoor Floors.Cremecapixabafrente0320260401, 4.7 - Granite Flooring Applied On Sidewalks Or Outdoor Floors.Cremecapixabafrente0420260401, 4.7 - Granite Flooring Applied To Sidewalks Or External Flooring.Cremecapixabafrente0520260401, 4.8 - Coating With Granite, Applied To Walls, Laying With Industrialized Mortar, External Environment, Including Grouting.Brancofortalezafrente0720260401, 5.1 - Manual Excavation For Crown Block Or Footing, Including Excavation For Placement Of Formwork. Af012024front0520260401, 5.2 - Manufacturing, Assembly And Disassembly Of Formwork For Containment Curtain, In Sheet Metal
|