Tender For Macadamization Of Inner Links Of Zagoo Kharian Ringzabal- 1 Supply Laying Spreading And Compacting Stone Aggregate Of Specified Size To Wbm Specifications In Uniform Thickness, Hand Picking Rolling With 3 Whelled Road/Vibratory Roller 8-10 Tonne Capacity In Stage To Proper Grade And Camber Applying And Brooming Requisite Type Of Screening/Binding Material To Fill Up Interstices Of Coarse Aggregate Watering And Compacting To The Required Density. (90Mm To 45Mm Size Stone Aggregate With Type-A Screening Complete Job) Including All Carriges 2 Supply Laying Spreading And Compacting Stone Aggregate Of Specified Size To Wbm Specifications In Uniform Thickness, Hand Picking Rolling With 3 Whelled Road/Vibratory Roller 8-10 Tonne Capacity In Stage To Proper Grade And Camber Applying And Brooming Requisite Type Of Screening/Binding Material To Fill Up Interstices Of Coarse Aggregate Watering And Compacting To The Required Density. (63Mm To 45Mm Size Stone Aggregate With Type-A Screening Complete Job) Including All Carriges 3 Providing/Laying, Spreading And Compacting Graded Stone Aggregate Size (43 Mm - 0.075 Mm) To Wet Mix Macdam (Wmm) Specification Including Premixing The Material With Water At Omc In Metallic Mix Plant, Carriage Of Mixed Material By Tipper To Site For Avg. Lead Of 40 Km, Laying In Uniform Layers With Mechanical Paver Finisher In Subgrade/Base Course On Well Prepared Surface And Compacting With Vibratory Roller Of 8-10 Tonne Capacity To Achieve The Desired Density Complete As Per The Specifications And As Per Specifications Of Engineer In Charge. 4 Providing And Applying Tack Coat On W.B.M. @0.74 Kg/Sqm Using Hot Straight Run Bitumen Of Grade Vg-10, Including Heating The Bitumen, Spraying The Bitumen With Mechanically Operated Spray Unit Fitted On Bitumen Boiler, Cleaning And Preparing The Existing Road Surface As Per Specifications. 5 Providing And Applying 50 Mm Thick Bituminous Macadam Base Course With Stone Aggregate Of Quantity Size And Grading As Specified In Cpwd Specifications And Straight Run Bitumen Of 80/100 @3.5 % By Weight Of Total Mix Including Hot Mixing Of Stone Aggregate And Bitumen In Hot Mix Plant, Transporting And Laying Mixed Material With Paver Finisher To The Required Level And Grade, Rolling With Road Roller Of 8-10 Tonne Capacity To Achieve The Required Compaction And Density Including Cost And Carriage Of All Materials Involved Upto Site Of Work Complete, Tools, Plants, Equipments And All Allied Machinery, Labour Taxes, Fee, Testing Charges For Maintaining Quality Control During And After Execution Of Work Complete In All Respects Including Cost And Carriage Of Bitumen.
Contact Information
Contact Person
Executive Engineer RnB Division Budgam
Address
Engineering Complex Budgam
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113181077
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.