|
Construction Work Of Kitchen Shed At Lakshminagar Pre Primary School In Vantigodi Gp At Mudhol Taluka - Vntgi Handling Loading And Unloading 3Percent On Material,Vntgi Labour Charges For Lifting And Placing In Position And Making Connection At 7Percent On Material,Vntgi Polyenthylene Water Storage Tank Of Specified Capacity L,Vntgi Compensation For Earth Taken From Private Land,Vntgi Three Wheel 80-100 Kn Static Roller,Vntgi Water Tanker 6 Kl Capacity,Vntgi Motor Grader At 50 Cum Per Hour,Vntgi Dozer D-50 For Spreading At 200 Cum Per Hour,Vntgi Unloading Of Earth As Per Item 1.1 (Iv),Vntgi Loading Of Earth As Per Item 1.1 (Ii),Vntgi Tipper 5.5 Cum With 10 Tonne Capacity,Vntgi Hydraulic Excavator 0.9 Cum Bucket Capacity At 60 Cum Per Hour,Vntgi Water Tanker,Vntgi Generator 33 Kva,Vntgi Water,Vntgi Broken Stone Aggregate 40 Mm Size,Vntgi Pvc Pipe Of 4 Kg Per Cum 75 Mm,Vntgi Mathi/Nandi Wood Scantling,Vntgi Hom Of Machinaries For Planing,Vntgi Add Cutting And Other Wastage 5Percent,Vntgi Mathi/Nandi Wood Planks For Panels 25 Mm Thick,Vntgi Add Brush At 1Percent On Cost Of Paint,Vntgi Enamel Metal Paint,Vntgi Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3Percent On Cost Of Paint,Vntgi Ready Mix Primer Paint (Ready Mix Red Lead Paint),Vntgi Add Hom Of Welding And Grinding Machine At 4Percent On Material,Vntgi Welder Grade I,Vntgi Fitter Class I,Vntgi Ms Flat,Vntgi M.S Rods,Vntgi Add Hom Of Welding And Grinding Machine At 2 Percent On Material,Vntgi Fabricator,Vntgi 5.50 Mm Thick Plain Glass,Vntgi Chrominum Plated Screws,Vntgi Cleat Angles,Vntgi Alluminium Handles - 15 Mm,Vntgi Alluminium Tower Bolt - 20 Cm,Vntgi Pvc Edge Beading,Vntgi Rubber Beading For Shutters Beading,Vntgi Nylon Rollers,Vntgi Aluminium Window Frame Section 1.20 Mm Thick,Vntgi White Cement,Vntgi Ceramic Tiles Of Size 30 X 30 Cms,Vntgi Add Handling , Loading And Unloading At 2Percent On Material,Vntgi Pigment,Vntgi Cudddapah Slab 2.5 Cms Thick,Vntgi Add Brush, Putty, Sand Paper At 2Percent On Cost Of Paint,Vntgi Water Proofing Cement Paint,Vntgi Add Brush, Putty, Sand Paper, Roller At 5Percent On Cost Of Paint,Vntgi Plastic Emulsion Paint,Vntgi Painter Class I,Vntgi Add Brush, Putty At 5Percent On Cost Of Distemper Primer,Vntgi Distemper Primer,Vntgi Add Providing And Removing Scaffolding At 3Percent On Labour,Vntgi Burnt Bricks Class 35 (Non Modular),Vntgi Binding Wire,Vntgi Tmt Bars Fe 500,Vntgi Formwork, Centering And Scaffolding For Chejjas, Canopy And Other Architectural Projections Of Minor Sections,Vntgi Formwork, Centering And Scaffolding For Roof Slab,Vntgi Formwork, Centering And Scaffolding For Columns And Piers,Vntgi Form Work For Foundation Upto Plinth,Vntgi Hom Of Vibrator 0.71 Days,Vntgi Plasticizer / Super Plasticizer,Vntgi Add Sundries Charges At 2 Percent On Material,Vntgi Add Handling , Loading And Unloading At 1Percent On Material,Vntgi Casurina Poles 100 - 150 Mm,Vntgi Stone Chistler Class Ii,Vntgi Boulders,Vntgi Size Stone 20 X 20 X 25 Cms,Vntgi Mason Class Ii (With Tools),Vntgi Mason Class I (With Tools),Vntgi Mixer (Concrete Small Used In Culvert),Vntgi Bond Stone 20 X 20 X 45 Cm,Vntgi Rubble Stones,Vntgi Over Head And Other Miscellaneous Charges,Vntgi Add Sundries Charges At 1 Percent On Material,Vntgi Add Watering Charges At 1 Percent On Material,Vntgi Mixer (Concrete) - 1 Cum Capacity,Vntgi Portland Cement,Vntgi Coarse Sand (Zone Iii),Vntgi Broken Stone Aggregate 12 Mm To 10 Mm Size,Vntgi Broken Stone Aggregate 20 Mm Size
|