|
1. Subject Of The Order.1.1. The Subject Of The Order Is The Performance Of Mining Works Aimed At Rebuilding And Securing The Przykos Longitudinal Section At Level Iiin The Underground Part Of The Wieliczka Salt Mine, On The Section From The Regis Shaft To The Lipowiec Transverse Shaft, Hereinafter Referred To As Mining Works, 1.2. The Aim Of The Mining Works Will Be To Reconstruct And Secure The Workings In Order To Restore Their Functionality And Improve The Safety Standards Of Staying There, As Well As Maintaining The Ventilation Function.2. Scope Of Mining Works. As Part Of The Execution Of Mining Works, The Contractor Is Obliged To: 1) Organize The Work Site (Area), 2) Prepare The Technology For Carrying Out The Works, 3) Provide Materials Necessary To Carry Out Mining Works, 4) Provide Machines And Devices Necessary To Carry Out Mining Works, 5) Provide Persons With Appropriate Authorizations And Qualifications To Supervise The Mining Works, 6) Provide Surveying Services, 7) Carry Out Mining Works.3. Execution Of Mining Works.3.1. Before Commencing Work In The Underground Workings Of The Wieliczka Salt Mine, The Contractor Is Obliged To Prepare The Technology For Their Implementation, Agree It With The Services Subordinated To The Operations Manager Of The Wieliczka Salt Mine (Hereinafter Referred To As Krzg), And Then, After Agreeing, Submit It For Approval By Krzg. The Technology Should Be Consistent With The Order Of Krzg No. Ksw/Z/Krzg/42/2018 Of April 24, 2018, Constituting Annex No. 2 To The Contract.3.2. Mining Works Should Be Performed In Accordance With: 1) Design Documentation Titled: Update Of The Technical Design For The Reconstruction And Protection Of The Przykos Longitudinal Section At Level Iiin Prepared By The Ordering Party, Constituting Annex No. 4 To The Contract, 2) Permit No. 11/26 Of The Conservator Of Monuments Of The Krakowskie Salt Mines Of April 27, 2026, Reference Number: Dk-453-12/26, Constituting Annex No. 5 To The Contract, 3) Instructions For Fire-Retardant Impregnation Of Wooden Housing Elements And Decoration Of Workings In K.S. Wieliczka S.A. For Inflammable Material, Constituting Annex No. 6 To The Contract, 4) Instructions For Safe Dressing Of Ceilings And Side Walls In Underground Corridor And Chamber Workings Of The Wieliczka Salt Mine, Constituting Annex No. 7 To The Contract, 5) Instructions For Safe Manual Transport On The Surface And In Underground Workings Of The Wieliczka Salt Mine, Constituting Annex No. 8 To The Contract, 6) Instructions For Inserting Onto The Track Of Derailed Underground Wagons, Constituting Annex No. 9 To The Contract, 7) Instructions For The Safe Performance Of Work Using Power Tools, Constituting Annex No. 10 To The Contract, 8) Order Of The Krzg No. Ksw/Z/Krzg/48/2023 Of June 14, 2023 On The Selection Of The Casing, Constituting Annex No. 11 To The Contract, In The Scope Covering The Verification Of The Assumptions Adopted In The Design Documentation Technical Solutions.9
|