The Subject Of The Order Is The Renovation Of Ground Floor Rooms In The Building At Ul. Raciborska 260 In Rybnik. Scope Of The Subject Matter Of The Order: 1. General Construction Works: 1) Demolition Works: A) Dismantling Of Brick Partition Walls And Plasterboard Walls, B) Dismantling Of Floors And Wall Tiles, C) Carving Out Ventilation Grilles And Doors From The Wall, D) Removing Loose Internal Plasters, E) Dismantling Of Electrical Equipment, F) Dismantling Of Door Joinery, 2) Flooring And Cladding: A) Fragmentary Tearing Of The Plastic Floor, B) Disassembly Of Wall Strips, C) Tearing Off The Plinth, D) Preparation Of The Base, Anti-Moisture Insulation, E) Installation Of Self-Leveling Screeds, F) Installation Of Ceramic Tile Floors, G) Facing Walls With Ceramic Tiles, 3) Bricklaying And Plastering Works: A) Reconstruction Of The Window Opening, B) Installation Of Lintels L,C) Partial Bricking Of Building Partitions,D) Construction Of New Brick Partition Walls,E) Replenishment Of Plasters On Walls And Ceilings,F) Construction Of New Partition Walls Of Rooms In The Plasterboard System,G) Priming Of Substrates,H) Making Aprons Of Ceramic Tiles Up To A Height Of 2.0 M In The Area Of Wet Zones,4) Painting Works: A) Removing Old Wallpapers From Walls And Ceilings,B) Preparing The Surface For Painting - Cleaning, Washing, Refinishing The Surface, C) Plastering The Walls And Ceilings, D) Painting With Latex Paints, E) Making Dirt-Resistant Wainscoting On The Walls Of Passageways Up To A Height Of 1.5 M, 5) Replacing Door And Window Joinery: A) Delivery And Installation Of Internal Doors With Frames, B) Delivery And Installation Of Three-Glazed Pvc Window Joinery With An Air Vent Coefficient W/M2xk = 0.9, C) Adjustment/Repair Of Existing Window Joinery, D) Delivery And Installation Of Internal And External Window Sills, E) Installation Of Ventilation Grilles In Doors In Sanitary Rooms, F) Delivery And Installation Of A Transitional Closed Steel Grate In The Corridor In The Area Of The Main Electrical Switchboards, 6) Finishing Works: A) Installation Of Ventilation Grilles In Rooms.2. Installation Works: 1) Sanitary Installations: A) Disassembly Of The Existing Water And Sewage Installation, B) Dismantling Of Bathroom Fittings, Washbasins, Toilet Bowls, C) Installation Of Plastic Cold And Hot Water Pipelines, D) Installation Of Pvc Sewage Systems, E) Insulation Of The Pipelines, F) Flushing Of The Water And Sewage Installation, G) Tightness Test Of The Water And Sewage Installation, H) Installation Of Bathroom Fittings,I) Installation Of Washbasin Faucets, Washbasins, Compact Toilet Bowls,J) Delivery And Installation Of Electric Capacitive Water Heaters - 2 Pieces With A Minimum Capacity Of 60 Liters Each,2) Electrical Installation: A) Disassembly Of Electrical Installation Equipment,B) Laying Of Electrical Installation Cables In Rooms,C) Installation Of Electrical Installation Equipment (Boxes, Sockets, Switches),D) Installation Of A Board Switchboard
|