4.1. The Subject Of The Order Is The Modernization (Reconstruction) Of The Access Road To Agricultural Land In Skrzyszew, Section 680 Meters Long. 4.2. The Scope Of The Order Includes In Particular The Following Works: A) Substructure: - Main Channels. 30 Cm Made In Soil Of Categories Ii-Iv On Road Or Sidewalk Widenings - 255.15 M2, - Drainage Layers Made And Mechanically Compacted With A Thickness Of 10 Cm – 255.15 M2, - Mechanically Compacted Cement-Sand Backfill Layers, Thickness: 10 Cm - 255.15 M2, - Upper Layer Of The Foundation Made Of Crushed Aggregates With A Thickness Of 15 Cm After Compaction - 218.70 M2; B) Surface: - Mechanical Cleaning And Sprinkling With Cold Asphalt Emulsion Of The Foundation Or Concrete/Bituminous Surface Emulsion Consumption 0.5 Kg/M2 - 2605.75 M2, - Leveling The Existing Foundation With Mineral-Bitumen Mixture, Mechanical Asphalt In An Average Amount Of 100 Kg/M2 - 260.58 T, - Surfaces Made Of Mineral-Bituminous Asphalt Mixtures With A Thickness Of 3 Cm After Compaction (Wearing Layer) - 2537.75 M2; C) Roadsides: - Repairs Of Dirt Roads - Profiling Of Roadsides - 1020.00 M2, - Surfaces Made Of The Mixture Unbound Crushed Aggregate 0/31.5 - Layer Thickness After Rolling 10 Cm - Roadside - 1020.00 M2; D) Measurement Works For Linear Earthworks - Road Route In Plain Terrain - 0.68 Kme) Vertical Markings: - Vertical Road Signs - Steel Pipe Posts - 3 Pcs., - Vertical Road Signs - Prohibition, Mandatory, Warning And Information Signs With An Area Of Up To 0.3 M2 – 4 Pcs., 4.3. A Detailed Description Of The Subject Of The Order Can Be Found In: 1) Design Documentation, 2) Detailed Technical Specifications (Sst), 3) Bill Of Quantities, Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Design Documentation And Sst. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence Of Works Not Included In The Bill Of Quantities Or Works In Larger Quantities Than Those Accepted In The Bill Of Quantities During The Execution Of The Contract Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation And Sst.
Contact Information
Address
Gmina Ulan-Majorat,Ulan-Majorat,21-307,Lubelskie,Pl811 - Bialski
Email
ug@ulanmajorat.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113148317
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.