The Subject Of This Procedure Is Thermal Modernization Of The Building Of A Community Center In Przysowy Located On Plot No. 32 Within The Geodetic Area Of Przysowy. The Task Referred To Above Is Carried Out As Part Of The Project Improvement Of Energy Efficiency Of Public Buildings In The Chorzele Commune Co-Financed By Funds From The European Regional Development Fund Under Priority: Ii European Funds For The Green Development Of Mazovia, Measures: 2. Energy Efficiency Of The European Funds For Mazovia 2021-2027 Program, Co-Financing Agreement No. Fema.02.01-Ip.01-04B3/24-00 Of August 8, 2025. Construction Works In The Building Of The Fire Station And Community Center In Przysowe Include In Particular: Eligible Costs: 1) Insulation Of The External Walls Of The Building With Polystyrene Of Thickness. 15 Cm Along With Thin-Layer Facade Plaster Made Of Silicone Plaster; 2) Insulating The Plinth With Styrofoam Thickness. 10 Cm Along With The Implementation Of A Thin-Layer Facade Plaster, 3) Insulating The Ceiling Of The Building In The Unheated Attic With Mineral Wool 10 Cm Thick. 25 Cm,4) Replacement Of Internal Doors Between The Unheated Attic And The Heated Room Along With Associated Works;5) Replacement Of Old-Type Windows In The Building With Pvc Windows Together With Associated Works, 6) Implementation Of Moisture-Proof Insulation In The Building,7) Replacement Of Internal And External Window Sills,8) Performance Of Sheet Metal Work, 9) Construction Of Roofs Over The Entrances, 10) Replacement Of The Existing Building Gutter, 11) Works Reconstruction Around The Building,12) Reconstruction And Finishing Works On The Façade,13) Demolition And Construction Of Stairs With A Stainless Steel Handrail,14) Installation Of A 9.9 Kwp Photovoltaic Installation With Inverters And Accessories, 22 Modules With A Power Of 450W Each,15) Installation Of An Inverter,16) Installation Of An Automatic Dc Disconnector,17) Installation Of Protections In Switchboards,18) Conducting And Connection Of Electrical Cables,19) Connection To The Electrical Installation In The Buildings Switchboard,20) Activation Of The Inverter,21) Installation Of An Internal Central Heating System In The Building,22) Installation Of A 15Kw Air-To-Water Heat Pump,23) Installation Of A Lightning Protection System, Taking Into Account The Newly Installed Devices, 24) Installation Of Nesting Boxes For Birds In Accordance With The Ornithological Opinion Constituting Part Of The Design Documentation. Non-Eligible Costs: 1) Construction Of A Ramp For Disabled People In Front Of Main Entrance To The Fire Station And Community Center Building. Note: A Detailed Description Of The Subject Of The Order Is Presented In The Annexes To The Swz, Which Include: A) Description Of The Subject Of The Order In Annex No. 1.2. To Swz) Design Documentation - Annex No. 10; B) Technical Specification For The Execution And Acceptance Of Construction Works - Annex No. 11;
Contact Information
Address
Gmina Chorzele,Chorzele,06-330,Mazowieckie,Pl924 - Ostrołęcki
Email
sekretariat@chorzele.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113148291
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.