1. The Subject Of This Procedure Is The Implementation Of The Investment Entitled: Expansion Of The Municipal Road In Nadbzurzańska Street In Łowicz - Stage Ii, Covered By Co-Financing Under The Government Road Development Fund For 2026.2. The Scope Of The Planned Investment Includes The Following Types Of Surfaces Of Individual Elements: 1) Road Surface, Pedestrian And Bicycle Path Surface: Bitumen, 2) Sidewalk Surface: Concrete Cubes. 6Cm. 3) Exit Surface: Concrete Cubes. 8Cm. 4) Roadside Surface: Reclaimed Asphalt Thick. 15Cm.3. Characteristic Parameters Determining The Size Of The Facility Or The Scope Of Road Construction Works: 1) Roadway: • Wearing Course Ac 11S Asphalt 50/70 - 5Cm (Laid Over The Entire Width Of The Road Without Joints); • Geosynthetic Reinforcement Mesh Anchored To The Lower Layer• Corrective Milling Of The Existing Asphalt Surface• Existing Road Construction Layers2) Widening Of The Road:• Wearing Course Ac 11S Asphalt 50/70 - 5Cm• Binding Layer Of Ac 16W Asphalt 50/70 - 6Cm• Geosynthetic Reinforcement Mesh Anchored To The Lower Layer• Mixture Base Unbound With Aggregate 0/31.5 -20 Cm After Compaction• A Layer Of Improved Substrate Made Of A Cement-Bound Mixture C 3/4, Thick. 15Cm (Supplied From The Concrete Plant)• G1 Category Soil*The Road Will Be Framed On Both Sides With A Concrete Curb (15X30)Cm With A Clearance Of 12Cm And A Clearance Of 6Cm (On The Side Of The Designed Sidewalk And Green Areas), A Curb (15X22)Cm With A Clearance Of 2Cm (On The Side Of The Exits). At Pedestrian Crossings, The Border Will Be A Concrete Curb (15X22) Cm With A Clear Width Of 0 Cm And A Concrete Transition Curb (15X30-15X22) Cm. On The Side Of The Green Areas, The Border Will Be A Curb (15X30) Cm With A Clear Width Of 12 Cm.3) Sidewalk:• Concrete Paving Stones Without Bevel / Integration (Indicator) 30X30 Cm - 6Cm• Cement-Sand Ballast - 3 Cm (1:4)• Base Made Of An Unbound Aggregate Mixture 0/31.5 -10 Cm After Compaction• A Layer Of Improved Substrate Made Of A Mixture Bound With C1.5/2 Gr. Cement. 15Cm (Delivered From The Concrete Plant)• G1 Category Soil*The Sidewalk Border On The Side Of The Green Areas And The Border Of The Road Will Be A Concrete Border (8X30)Cm. At The Pedestrian Crossing At The Connection With The Road, A Concrete Curb (15X22) Cm With A Clearance Of 0 Cm And A Concrete Curb (15X30-15X22) Cm Should Be Placed. The Exits Will Be Separated Using A Different Color Of The Cube.4) Pedestrian And Bicycle Path:• Wearing Course Of Ac 8S Asphalt 50/70 - 4Cm• Binding Layer Of Ac 16W Asphalt 50/70 - 4Cm• Foundation Made Of An Unbound Mixture Of Aggregate 0/31.5 - 15 Cm After Compaction• Layer Of Improved Subgrade Made Of A Mixture Bound With C1.5/2 Cement Gr. 20Cm (Delivered From The Concrete Plant)• Soil Category G1*The Bicycle Path Will Be Framed With A Concrete Border (8X30)Cm.5) Exits:• Non-Beveled Concrete Cubes, Thickness. 8Cm• Cement And Sand Bedding, Thickness. 3Cm (1:4)• Base Made Of A Mixture Unbound With Aggregate
Contact Information
Address
Miasto Łowicz,Łowicz,99-400,Łódzkie,Pl715 - Skierniewicki
Email
wydzial.inwestycji@um.lowicz.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113148287
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.