4.1. The Subject Of The Order Includes The Execution Of Construction Works On The Investment Task Entitled: Thermal Modernization Of The Primary School Building Complex In Gorzkowice4.2. The Scope Of The Order Includes: 1. Construction Works In The Field Of Insulation: - Dismantling The Existing Wall Insulation, - Insulating External Walls Along With Insulating Foundation Walls, - Insulating The Flat Roofs Of The Old Part Of The Building And The Connector With The Hall (Upper Part), - Insulating The Flat Roof Of The Sports Halls Facilities, - Insulating The Roofs Of The Main Entrance And The Connector With The Hall (Lower Part), - Insulating Ceiling Of The Top Floor Of The Old Part Of The Building, - Replacement Of Windows And Doors. Attention. The Existing Window Subdivision Should Be Retained To Ensure Re-Installation Of The Existing Blinds. - Renovation Of The Roof Of The Old Part Of The Building, - Reconstruction Of The External Entrance To The Kitchen, - Renovation Of The Walls Of The Outbuilding (Garage); 2. Modernization Of The Heating System: - Replacement Of The Heating Installation: Existing Central Heating Pipes. In The Sports Hall To Be Left, Existing Radiators To Be Replaced. Underfloor Heating Installation In The Sports Hall To Be Left. Bottom-Fed Radiators Were Designed In The Sports Hall. In The Remaining Part Of The Building, Side-Fed Radiators Equipped With Thermostatic Valves And Thermostatic Heads Were Designed (Gas Heads With A Built-In Sensor, Some Of The Heads Are Protected Against Manipulation) - A Heat Source In The Form Of Gas Heat Pumps With Power Supply From The Gas Installation: The Designed Solution Provides For The Use Of Two Sets Of Four Gas-Powered Air Absorption Heat Pumps In A Silent Version With A Peak Source.3. Electrical Works: - Wlz, Internal Power Lines, - Sub-Distribution, Power Supply Installation For Technological Receivers, - Lightning Protection Installation And Equalizing Connections, - Replacement Of Internal Lighting.4.3. Construction Waste That Can Be Recycled, In Particular Gutters, Metal Scrap, Etc., Is Obliged To Be Handed Over To The Ordering Party By The Contractor, Unless The Ordering Party Decides Otherwise.4.4. The Scope Of Work Covered By The Documentation Should Be Carried Out Without Excluding The Facility From Use, With A Guarantee Of Ensuring The Continuity Of Educational Services. It Is Recommended To Intensify The Works During Periods Free From Teaching Activities (Holidays, Holidays)4.5. The Contractor Is Obliged To Perform Construction Works In Accordance With The Dnsh Principle. 4.6. Environmental Criterion1) When Performing Works Related To The Installation Of The Installation, The Contractor Will Be Obliged To Use Zero-Emission Cordless Tools Charged By Reusable Batteries. 2) The Contractor Is Obliged To Use Only Equipment That Will Not Adversely Affect The Quality Of The Work Performed. 3) Equipment Owned By The Contractor Or Rented To Perform The Work Must Be Maintained In Goo
Contact Information
Address
Gmina Gorzkowice,Gorzkowice,97-350,Łódzkie,Pl713 - Piotrkowski
Contact No.
0446818006
Email
gmina@gorzkowice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113148272
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.