1. The Subject Of The Order Is The Implementation Of The Task Entitled: Construction Of A Hiding Place With A Warehouse And Office And Social Facilities For The Volunteer Fire Department As Part Of Olioc (Civil Protection And Civil Defense) Of The Leżajsk Commune Along With The Necessary Technical Infrastructure2. The Scope Of Work Under The Above-Mentioned Task Includes In Particular: 1) Submitting A Notice Of The Intended Commencement Date Of Construction Works To The District Construction Supervision Inspectorate, 2) Preparing Documentation Necessary To Complete The Construction, 3) Obtaining A Decision On Behalf Of The Ordering Party For A Permit For Partial Use Of The Building, I.E. Floor -1 - Hiding Place And Floor 0 - Warehouses, 4) Execution Of Construction Works: A) Construction Industry: - Earthworks, - Works Foundations, Masonry Works, Construction Of Reinforced Concrete Walls In Basements, Construction Of External Stairs To Basements With Reinforced Concrete Casing And Internal Stairs, Construction Of Floors, Construction Of Ceilings Over The Basement, Ground Floor, Above The First Floor And A Ring On Brick Walls), Construction Of Reinforced Concrete Elements, Assembly Of The Roof Truss With Covering And Flat Roof Over The Tower, Plastering, Internal Cladding, Painting, Installation Of Windows And Doors, Construction Of A Ramp For The Disabled, Landscaping, Delivery Of A Tracked Stair Climber With A Transport Trolley - 1 Set, B) Sanitary Industry, Installation Of Cold And Hot Water, Installation Of A Sanitary Sewage System, Installation Of An Air-To-Water Heat Pump Including Accessories And Fittings, Installation Of An Electric Capacitive Heater With A Capacity: V = 50L And V = 120L (Level -1), Execution Of A Central Heating Installation Along With The Installation Of Radiators And Fittings - Ground Floor And First Floor, Installation Of Electric Radiators (Level -1), Installation Of A Mechanical Ventilation System, Construction Of A Sanitary Sewage Connection, Construction Of A Water Supply Connection, Execution Of An External Rainwater Drainage System Together With The Installation Of A Rainwater Tank With A Capacity Of At Least 20 M3. C) Electrical Industry: - Installation Of Internal And External Lighting Installation, Plug Sockets, Evacuation And Emergency Lighting, - Telecommunications/Multimedia Internet Network Lan Installation, - Installation Of Cap Installation, - Installation Of Call System, - Installation Of Equipotential Bonding And Grounding Installation, - Construction Of An External Cable Line, Installation Of A Lightning Protection System, Installation Of A Photovoltaic Installation, Installation Of A Video Monitoring System 5) Adaptation Of The Building To The Needs Of Disabled People: The Building Should Be Adapted For People With Various Types Of Disabilities, Taking Into Account The Needs Resulting From Particular Types Of Disabilities.
|