The Scope Of The Subject Matter Of The Order Is: 1. Strengthening The Roof Truss And Replacing The Roof Covering Together With Gutters, Downpipes And Sheet Metal Flashings. Due To The Change Of The Roof Covering From Sheet Metal To Ceramic Tiles, It Is Planned To Strengthen The Roof Purlins. With A Span Of 5.1 M In Both The Southern And Northern Areas. Due To The Insufficient Insulation Of The Attic Partitions, It Is Assumed: Horizontal Part Of The Attic: - Dismantling The Existing Layer Of Boards, - Laying - Raising The Joists By The Thickness Of The Additional Layer Of Insulation, - Adding A Layer Of 15 Cm Thick Mineral Wool, - Re-Laying The Previously Torn Off Boards. Sloping Part Of The Attic: - Dismantling The Existing Metal Roof Tile Covering, - Dismantling The Wind Insulation And Roof Formwork, - Raising The Roof Rafters By 10 Cm With Square Timbers, - Supplementing The Existing Mineral Wool Insulation With An Additional Layer Of Thickness. 10 Cm, - Laying A Partition Made Of Wind-Insulating Foil And Then Counter Battens And Battens, - Relocating Existing Roof Windows, - Making A Roof Covering With Overlapping Ceramic Tiles Along With Sheet Metal Flashings.2. Internal Brickwork And Plastering Works On The Ground Floor And Attic. It Is Planned To Change The Location And Rebuild Some Of The Partition Walls On The Ground Floor And First Floor, As Well As Change The Width Of Door Openings In The Internal Walls, Over Which Ceramic And Reinforced Concrete Lintels Will Be Installed. New Sections Of Ground Floor Partition Walls Should Be Placed On A Layer Of Concrete. New Cement Plasters Will Be Applied On New Partition Walls And In Places Where The Existing Plaster Is Loose. – Vape. And Finished With Ceramic Tiles Or By Painting. In The Rooms Next To The Washbasins, Protective Aprons Will Be Made On The Walls, 75 Cm Wide From The Axis Of The Washbasin In Both Directions, Up To A Height Of 1.50 M From The Floor Level.3. Replacement Of Floor Layers In The Basement, Ground Floor And Attic. Due To The Planned Installation Of Underfloor Heating In The Ground Floor Rooms, It Is Planned To Dismantle The Existing Thick Floor Layers. 18 Cm And The Implementation Of New Layers - Pvc Flooring Is Planned In The Residents Rooms And Administrative Rooms. Homogeneous Lining, Resistant To Wear And Abrasion, Thickness: Min. 2Mm. The Carpet Is Intended For Use On Floors With Underfloor Heating. - In The Passageways And In Some Rooms (In Accordance With The Drawing Specifications) The Floor Is Made Of Rectified Stoneware Tiles 30X30 Cm, Anti-Slip (R10), Easily Washable, Abrasion-Resistant. Light Gray (Matt) Color. - In The Ground Floor Meeting Room, The Floor Is Planned To Be Made Of Stoneware Tiles Imitating A Parquet Floor, Light Oak Color. - Wall Cladding Of Sanitary Facilities And Other Indicated Rooms (Kitchenette, Scullery) With Glazed, Rectified Ceramic Wall Tiles, 30X60 Cm, White. - Ceramic Cladding Up To A Height Of 2 M From The Floor Level.4. Replacement
Contact Information
Address
Powiat Leżajski,Leżajsk,37-300,Podkarpackie,Pl824 - Tarnobrzeski
Contact No.
+48172404500
Email
powiat@starostwo.lezajsk.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113148192
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.