Bridge Construction Work – B6 Ou Neustadt - Partial Structures Of The Db Bridge. Replacement New Db Bridge As Part Of The B6 Ou Neustadt Main Positions, Main Masses (Approx. Information): 24,000 M³ Construction Pit Production, 45,000 M³ Of Coarse-Grained Soil, 6,500 M² Of Topsoil, 2,500 M Of In-Situ Concrete Piles, 7,000 M³ Of Reinforced Concrete, Installation Of 18 Bridge Bearings, 1,200 T Supply And Install Superstructure Steel Structure 8,000 M² Corrosion Protection 2,000 M² Sealing Work 1,400 M² Produce Mastic Asphalt 40 M Install Ükos 2,800 M² Produce Steel Sheet Piling 860 M³ Produce Underwater Concrete 300 M Make Trough 4,200 M² Accept And Dispose Of Hgt 7,600 M³ Soil Disposal 2,000 M³ Sob Disposal 17,000 M³ Install Frost-Resistant Soil 2,500 M² Produce Sts 5,500 M² Produce Asphalt Base Course 3,000 M² Produce Asphalt Binder 3,000 M² Produce Stone Mastic Asphalt 14 Pcs. Install Shafts 1 Create Settling Basin 1 Create Rain Retention Basin Create 1,300 M² Of Paved Areas, Create 700 M Of Cable Trenches And Cables, Dismantle 18 Ola Masts Including Foundations And Re-Found 18 Ola Masts
Contact Information
Address
Bismarckstraße 39
Contact No.
+49 5021606-0
Email
eVergabe-NI@nlstbv.niedersachsen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113145755
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.