|
External Receiver For Fiber Optic Console. Type: External Fiber Optic Data Receiver, Compatibility: Single-Mode Fiber Sm G.652D, Wavelength: 1310/1550 Nm, Connector: Fc/Sc (Apc/Upc), Transmission Speed: Up To 1 Gbit/S, Receiver Sensitivity: ≤ −28 Dbm, Interface To The Console: Ethernet / Uart / Usb, Power Supply: 5–12 V Dc, Power Consumption: ≤3 W, Mounting: Bracket / Quick Removal On The Remote Control Body, Operating Temperature: −20…+55 °C, Dimensions: ~100×60×30 Mm, Weight: ≤300 G. After Delivery Of Components, The Supplier Assembles The Product(S) And Conducts Trial Tests (Test Flight) Of At Least 1 (One) And No More Than 2 (Two) Copies. Final Acceptance Of The Work Results Is Carried Out By The Customer Only After Successful Completion Of Assembly And Trial Tests, Following Which The Parties Sign A Certificate Of Completion (Assembly And Test Certificate). If Deficiencies Are Identified During The Assembly Or Testing Process, The Customer Has The Right Not To Sign The Certificate Until The Identified Defects Are Completely Eliminated., Ground Station For Fiber Optic Communication Lines. A Fiber Optic Ground Station Is Designed To Receive, Amplify, Convert And Distribute An Optical Signal Over A Fiber-Optic Link; Inputs: Backbone Optical Cables (Smf G.652/G.655 Via Sealed Leads), Linear Optical Ports Lc/Sc, Dwdm/Oadm Ports, Edfa/Raman Inputs/Outputs, Otdr Monitoring Port, Sfp/Sfp+/Qsfp/Qsfp28 Slots, Ethernet Rj-45, Console Management Port (Rj-45/Usb), Synchronization Ports Bits/1Pps/10 Mhz, Power Input ~220 V Ac And/Or −48 V Dc, Ups Input, Pe Grounding Terminal, Dry Contact Alarm Inputs, Temperature And Tamper Sensors, Ventilation And Cable Inputs Of The Case. The Supplier Assembles The Product(S) And Conducts Trial Tests (Trial Flight) Of At Least 1 (One) And No More Than 2 (Two) Copies. Final Acceptance Of The Work Results Is Carried Out By The Customer Only After Successful Completion Of Assembly And Trial Tests, Following Which The Parties Sign A Certificate Of Completion (Assembly And Test Certificate). If Deficiencies Are Identified During The Assembly Or Testing Process, The Customer Has The Right Not To Sign The Certificate Until The Identified Defects Are Completely Eliminated.
|