|
Tender for Construction Of Embankment With Approved Material Obtained From Borrow Pits With A Lift Upto 1.5 M, Transporting To Site, Spreading, Grading To Required Slope And Compacting To Meet Requirement Of Tables 300.1 And 300.2 With A Lead Upto 1000 M As Per Technical Specification Clause 301.5 , Excavation In Foundation In Ordinary Soil, Loam, Clay Or Sand Including Lift Upto 1.5M & Lead Upto 30M Including Filling Watering & Ramming Of Excavated Earth Into The Trenches Or Into The Space Between The Building & Inside The Foundation Trenches Or Into The Plinth, Removal & Disposal Of Surplus Earth As Directed By The Engineer In Charge Upto A Distance Of 30M From The Foundation Trenches. (Excluding Royalty ) As Per Sino. 251 , Granular Sub-Base With Well Graded Material Providing, Laying And Spreading Material(Mix In Place) On A Prepared Sub Grade With Rotavator And Compacting With The Road Roller At Omc To Achieve The Desired Unconfined Compressive Strength And To Form A Layer Of Sub-Base.400.1 , Providing, Laying, Spreading And Compacting Stone Aggregates Of Specific Sizes To Water Bound Macadam Specification Including Spreading In Uniform Thickness, Hand Packing, Rolling With Three Wheel 80-100 Kn Static Roller In Stages To Proper Grade And Camber, Applying And Brooming, Crushable Screening To Fill-Up The Interstices Of Coarse Aggregate, Watering And Compacting To The Required Density Grading 3 With 22.4 - 53 Mm Stone Ballast As Per Technical Specification Clause 405) , Concrete With 4Cm Gauge Brick Ballast, Fine Sand Of 1.25 Fineness Modulous And Cement In Proportion Of 12:6:1 In Foundation And Under Floor Including Supply Of All Material , Labour, And T&P Etc. Required For Proper Completion Of Work. As Per Sino. 273 , First Class Brick Work In 1:4 Cement And Coarse Sand Mortar In Foundation And Plinth Including Supply Of All Material, Labour, T&P Etc. Required For Proper Completion Of Work.As Per Sino. 305 , Cement Concrete With 2Cm (3/4) Gauge Approved Stone Ballast, Approved Coarse Sand And Cement In The Proportion Of 4:2:1 Including Supply Of All Materials Labour And T & P Etc Required For Proper Completion Of The Work As Item No. 279(I) , Providing And Laying Of Factory Made 80 Mm Thick Interlocking Cement Concrete Tiles (30 Mpa) Including 25Mm Thick Compacted Bed Of Fine Sand Compacting And Proper Embedding/ Laying Of Interlocking Tiles Leveling And Dressing Of Surface To Required Level And Slope, Filling Joints With Fine Sand Including The Cost Of Material, Labour T&P Etc. Required For Proper Completion Of Work As Directed By Engineer-In Charge.As Per New Item No.1 , Cement Concrete With 4Cm Gauge Approved Stone Ballast Approved Coarse Sand And Cement In The Proportion Of 8;4:1 Including Supply Of All Material, Labour And T&P Etc.Required For Proper Completion Of The Work As Per Si.No.281 , Struck Pointing With Cement Mortar Consisting Of One Part Cement And 2 Part Of Fine Sand Of 1.25 F.M On Brick Work Including Of All Material Labour And T&P Etc.Required For Proper Completion Of The Work As Per Si.No 574 , Supply Of Reinforced Cement Concrete Hume Pipe Np3 Class.Non Schedule Item No 5(I) , Laying And Fixing Of Reinforced Cement Concrete Hume Pipe Np3 Class.Non Schedule Item No 5A(I) , White Washing Two Coat , Including Supply Of All Materials Labour & T&P Etc As Per Si No 671+672 , Supply & Fixing Of Informatory Sign. Board
|