Tender for Restoration Of Rain Cuts Restoration Of Rain Cuts With Soil, Moorum Gravel Or A Mixture Of These, Clearing The Loose Soil, Benching For 300Mm Width Laying Fresh Material In Layers Not Exceeding 250 Mm And Compaction With Plate Compactor Or Power Rammer To Restore The Original Alignment, Level And Slopes As Per Drawings And Morth Specifications Clause 3002 Mechanical Means , Excavation For Structures Earthwork In Excavation For Structures As Per Drawing And Morth Specifications Clause 304.1 Including Setting Out, Construction Of Shoring And Bracing, Removal Of Stumps And Other Deleterious Material And Disposal Upto A Lead Of 50 M, Dressing Of Sides And Bottom And Backfilling In Trenches With Excavated Suitable Material. Hard Rock (Blasting Prohibited) , Providing Concrete For Plain/Reinforced Concrete In Open Foundations Complete As Per Drawings And Morth Specifications Clause 1702, 1703, 2102 & 2104 plain cement concrete Grade M 10 Nominal Mix 1:3:6 , Stone Masonry Work In Cement Mortar In Foundation Complete As Per Drawing And Morth Specifications Clauses 1402, 1405, 2102 & 2104 Including Weepholes As Per Morth Specifications Clauses 2706 Coursed Rubble Masonry (1St Sort) In 1:4 Cement Mortar , Plastering With Cement Mortar (1:4), 20 Mm Thick On Stone Work. , Cement Concrete Pavement Construction Of Un-Reinforced , Plain Cement Concrete Pavement M30 (Grade), Thickness As Per Design, Over A Prepared Sub Base, With 43/53 Grade Cement As Per Clause 602, Coarse And Fine Aggregates Conforming To Is:383, Maximum Size Of Coarse Aggregate Not Exceeding 31.5 Mm, Mixed In Fully Automatic Computerised Batching Plant Compatiable With Printer And Pen Drive And Transported To Site In Transit Mixer For Having Continuous Agitated Mixer, Manufactured As Per Approved Mix Design Including Pumping Of R.M.C. From Transit Mixer To Site Of Laying , With All Lead And Lift Including Cost Of Admixtures In Recommended Portion As Per Is 9103 To Accelerate/ Retard Setting Of Concrete, Improve Workability Without Impairing Strength And Durability As Per Direction Of Engineer In Charge Laid With A Fixed Form Paver (Laying And Fixing Of 150 Micron Thick Polythene Film And Finished In Continuous Operation Including Provision Of construction And Expansion, Construction Joints, Applying Debonding Strips, Primer, Sealant Near Approaches To Bridge/Culvert And Construction Joints, Admixtures As Approved, Curing Of Concrete Slabs For 14-Days Using Water Finishing To Lines And Grade As Per Drawing And Morth Specification Clause 602 With All Required Equipments (Dowel Bars & Tie Bar Will Be Paid Seprately).
|