1. The Subject Of The Order Is The Implementation Of The Investment Called Modernization Of The Sidewalk And Bicycle Path In The Park At The Bielański Forest.2. Location (Address): The Area Covered By The Investment Is Located In The Park At The Bielański Forest In Warsaw. The Path Starts From Ul. Gwiaździsta Along The Bielański Forest At The Level Of The Gdynia Coast, And Ends At The Intersection Of Dewajtis And Pergaminów Streets - Precinct 7-09-04, Plot No. 10 And 11.3. The Scope Of Work Includes In Particular: - Securing The Construction Site, Securing Slopes, Securing The Existing Trees; - Dismantling The Existing Asphalt Surface; - Dismantling The Existing Surface Made Of Concrete Slabs; - Dismantling The Existing Concrete Edges; - Complementing And Thickening The Construction Layers (Subbase, Binding Layer); - Construction Of A New Bituminous Surface From An Asphalt Mixture; - Construction Of A Strip Separating Routes For Various Purposes (Separating The Pedestrian Route From The Bicycle Route On A Section With Different Traffic Purposes); - Construction Of A Pedestrian Route From Concrete Slabs; - Reconstruction Of Vertical And Horizontal Markings; - Modernization Of The Existing Lighting. The Investment Area Is Located Within The Warsaw Protected Landscape Area. The Immediate Vicinity Is The Bielański Forest Reserve. Due To The Border Location Of The Investment, It Is Necessary To Pay Special Attention To Not Disturbing The Adjacent Area And Protecting The Existing Trees And Slopes During The Works.4. Accessibility For Disabled Peoplethe Subject Of The Order Is To Be Adapted To The Needs Of All Users Of The Facility, Including The Mobility Of Disabled People. It Must Meet The Requirements Regarding Applicable Regulations, Including Standards Resulting From Order No. 1682/2017 Of The Mayor Of The Capital City Of Warsaw Of October 23, 2017 On The Creation Of Accessible Space In The Capital City Of Warsaw, Including Infrastructure For Pedestrians, With Particular Emphasis On People With Limited Mobility And Perception, As Amended By Order Of The Mayor Of The Capital City Of Warsaw No. 291/2018 Of February 23 2018, No. 1783/2022 Of December 1, 2022 And No. 682/2023 Of April 11, 2023, And The Annexes To This Order: Accessibility Standards For The Capital City Of Warsaw, Hereinafter Referred To As Accessibility Standards, Constituting Annex No. 1 To The Order; Design And Implementation Standards Of Pedestrian Infrastructure In The Capital City Of Warsaw, Hereinafter Referred To As Pedestrian Infrastructure Standards, Constituting Annex No. 2 To The Ordinance. The Design Documentation Ensures The Accessibility Of The Area For Disabled People With Special Needs.5. Social Clausesthe Ordering Party Provides For Requirements Related To The Implementation Of The Order In Terms Of Employment By The Contractor Or Subcontractor Under An Employment Relationship, In The Circumstances Referred To In Art. 95 Of The Public Procurement Law, Which Were Includ
Contact Information
Address
Miasto Stołeczne Warszawa - Dzielnica Bielany,Warszawa,01-882,Mazowieckie,Pl911 - Miasto Warszawa
Contact No.
+48224434820
Email
bielany.zamowienia@um.warszawa.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113107737
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.