|
Job 1- Mechanized Loading And Removal Of Rubble, Including Transport Up To 1Km, Job 1- Transport Of Rubble By Dump Truck, From 1Km, Job 1- Mechanized Demolition Of Simple Concrete, Job 1- General Coordinator, Job 1- Senior Engineer/Architect, Job 1- Junior Engineer/Architect, Job 1- Engineer/ Full Architect, Project 1- Designer, Project 1- Designer Draftsman, Project 1- Sector Coordinator, Project 1- Consultant, Project 1- Cadist Designer, Project 1- Site Engineer, Site 1- Soil/Paving Laboratory Worker, Site 1- Laboratory Assistant, Site 1- Topography Assistant, Site 1- Surveyor (Sgsp), Job 1- Mechanical Excavation For Foundations And Trenches With A Depth Greater Than 4.0M, Job 1- Loading And Removal Of Earth To An Average Distance Of 1.0Km, With A 10M3 Dump Truck, Job 1- Supply Of Earth, Including Excavation, Loading And Transport To An Average Distance Of 1, Measured On Compacted Landfill, Work 1- Earth Compaction, Measured At The Landfill, Work 1- Pulling Out Guides, Includes Loading On Truck, Work 1- Demolition Of Concrete Pavement, Gutter Or Gutter, Work 1- Inc.27 - Concrete Base Fck=15.00Mpa For Guides, Gutters Or Gutters, Work 1- Rachão Foundation, Work 1- Planting Of Grass In Slabs, Job 1- Bica Corrida Base, Job 1- Graded Crushed Base, Job 1- Removal Of Earth Beyond The First Km, With 10M3 Truck, Job 1- Inc.27 - Supply And Installation Of Guides Type Pmsp 100, Including Earth Slope - Fck=25, 0Mpa, Job 1- Inc.27 - Construction Of Gutter Or Concrete Gutter - Fck=25, Job 1- Transport Of Concrete Pavement, Gutter And Gutter, Job 1- Transport Of Guides, Job 1- Popular Car 50% In Operation, Job 1- Ihd.23 - Ballast Of Crushed Stone And Stone Dust, Job 1- Supply And Laying Of Simple Concrete Pipes - Diameter 50Cm, Job 1- Supply And Laying Of Reinforced Concrete Pipes, Diameter 60Cm - Type Pa-2, Job 1- Double Boca De Lobo, Job 1- Ihd.23 - Supply And Laying Of Geotextile Blanket With Longitudinal Tensile Strength Of 16Kn/M And Transverse Traction Of 14Kn/M, Job 1- In.14 - Supply And Placement Of Box Type Gabion, H = 0.50 M, Mesh 8
|