|
Local Administration Of The Work And Maintenance Of The Site, Update Of The Drainage And Paving Project - As Built, Construction Site Facilities, Night Watchman With Additional Charges., Technological Control Of Work, Mobilization And Demobilization Of Equipment, Supply And Installation Of Site Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Demolition Of Simple Concrete Floor, Mechanized Using A Hammer, Without Reuse. Af_09/2023, Loading, Maneuvering And Unloading Debris In A 10 M³ Dump Truck - Loading With Hydraulic Excavator (0.80 M³ / 111 Hp Bucket) And Free Unloading (Unit: M3). Af_07/2020, Transport With 10 M³ Dump Truck, On Urban Road In Natural Bed (Unit: M3xkm). Af_07/2020, Disposal Of Solid Waste - Rubble, Solo Mechanical Excavation Of 1A Cat. Prof. Up To 2.00M With Backhoe Loader On Wheels 4X2 79Hp., Maneuvering And Unloading Soil And Granular Materials In 10 M³ Dump Truck - Loading With Wheel Loader (Bucket From 1.7 To 2.8 M³ / 128 Hp) And Free Unloading (Unit: M3). Af_07/2020, Solid Waste Disposal - Soil, Execution And Compaction Of Landfill Body (95% Of Normal Proctor Energy) With Predominantly Clay Soil Thickness 15 Cm - Exclusive Material, Excavation, Loading And Transport. Af_09/2024, Guide Laying (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height). Af_01/2024, Laying Of Guide (Curb) In Curved Section, Execution Of Machined Concrete Gutter, Molded In Place In Straight Section, 30 Cm Base X 15 Cm Height. Af_01/2024, Molded In Place In A Curved Section, Box With Simple Rectangular Grid, Masonry With Concrete Block 22X11x8cm, In One Go., Double-Walled Corrugated Hdpe Pipe For Rainwater Collection Network, Dn 400 Mm, Integrated Elastic Joint - Supply And Installation., Corrugated Hdpe Pipe Double Wall For Sewage Collection Network, Dn 600 Mm, Integrated Elastic Joint - Supply And Installation. Af_01/2021, Dn 1200 Mm, Opening For Simple Tubular Manhole D = 120 Cm In Concrete, Wings With 0° Condensity, Including Formwork And Materials. Af_07/2021, Hydraulic Ladder, Width Up To 1M, Cutting Or Landfill Water Descent Type In Steps (Dcd 02, 04 And Dad 02), Made Of Machined Concrete, Fck = 20 Mpa, Launched With A Pump, Including Frame, Materials And Formwork (3 Uses). Af_08/2022, Concreting Of Energy Sink, Using Jericas And Preparation In A 600 L Concrete Mixer - Commercial Sand And Gravel - Laying, Thinning And Finishing. Af_08/2022, Preparation Of The Bottom Of A Trench Less Than 1.5 M Width, With A Layer Of Sand, Manual Launching. Af_01/2026, Preparation Of Trench Bottom With A Width Greater Than Or Equal To 1.5 M And Less Than 2, Mechanized Backfilling Of Trench With Hydraulic Excavator (Bucket Capacity: 0.8 M³/Power: 111 Hp), Width 1.5 To 2, Depth 1.5 To 3.0 M, With Soil (No Replacement) 1St Category, With Percussion Soil Compactor. Af_08/2023, Po De Pedra (Quarry Station/Supplier, No Shipping), Trench Drainage With Submersible Pump. Af_12/2022, Regularization And Compaction Of Predominantly Clayey Soil Subgrade, For Pavement Construction Works. Af_09/2024, Construction Of Base And Sub-Base For Hydraulic Macadam Paving, With A Thickness Of 20 Cm - Exclusive Of Loading And Transport., Unidirectional Geogrid With Tensile Strength Of 100 Kn/M - Supply And I
|