|
Supply And Placement Of Construction Sign Made Of Galvanized Sheet 26, Esp. 0.45Mm, Dimension 3X1.5M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1, 25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two 2 Coats, Topographic Location Above Fifty 50 Reference Points, Including Marking Picket Stake, Horizontal Excavation, Including Loading And Unloading On 1St Category Soil With 100H Crawler Tractorblade: 2, 19M3. Af072020, Construction Of Base And Sub-Base For Paving Predominantly Crushed Clay Soil - 50%-50%, Mixture In Track, 15 Cm Thick - Exclusive Of Excavation, Loading And Transport And Soil. Af092024, Transport With A 10 M³ Dump Truck - Paved Highway., Loading, Maneuvering And Unloading Aggregates Or Soil In A 10 M³ Dump Truck - Loading A 300 Th Soil Plant And Free Unloading, Regularization And Compaction Of Predominantly Clayey Soil Subgrade, For Pavement Construction Works. Af092024, Transport With 10 M³ Dump Truck, On Urban Road In Natural Bed Unit: M3xkm. Af072020, Priming With Asphalt Emulsion Asphalt Emulsion Not Included, Petroleum Asphalt Emulsion For Priming Service - Eai, - Standard Dnit 1652013-Em And Dnit 1442014-Es, Bonding Paint, Petroleum Asphalt Emulsion; Rapid Rupture - Rr 2C - Dnit Em-1652013 - Em - Cationic Asphalt Emulsions., Execution And Application Of Cbuq Hot Machined Bituminous Concrete, Commercial Mass, Including Supply And Transport Of Aggregates And Bituminous Material, Exclusive Transport Of Asphalt Mass To The Track, Transport Of Bituminous Material With Distributor Tank Truck - Paved Highway, Transport Of Hot Bituminous Mixture With Truck With 6 M³ Thermal Bucket - Paved Highway, Scu Urban Concrete Gutter, Type 1, With Fck 15 Mpa, Width 50Cm With 3% Slope, 7Cm Wide, Der Standard, Excluding Curbs, Inclusive Excavation, Piping And Transport With Removal Of The Excavated Material In A Bucket, Curb Guide, In Concrete With Fck 20Mpa, Premolded, Mfc 01 Der-Mg Standard, Dimensions 12X16, 7X35cm, Exclusive Gutter, Piping And Transport With Removal Of The Excavated Material In A Bucket
|