Sewage Work – Hd-Cl-G1a Extension Of Sewage Deva And Sewage Hunedoara_Revision 1. Sectoral Contract For High Complexity Works. The Purpose Of The Contract Is The Purchase Of Design Services And The Execution Of Works For Hd-Cl-G1a Extension Of Seau Deva And Seau Hunedoara_Revision 1. The Activities That The Contractor Will Perform Will Include, But Will Not Be Limited To, The Following Main Services Presented In The Table Of Contents Below And Which Are Described In The Following, Collectively Referred To As The Design Documentation: No. Crt. Deliverable Name 1 Detailed Geotechnical Study 2 Detailed Topographic Study 3 Hydrogeological Study 4 Technical Execution Project And Execution Details 5 Technical Project For The Diversion/Protection Of Existing Utility Networks On Site 6 Technical Documentation For Obtaining All Approvals And Agreements 7 Technical Documentation For Obtaining The Construction Authorization 8 Technical Documentation For The Organization Of Execution 9 As-Built Technical Project Field Studies And Of Another Nature, As The Case May Be, Will Be Carried Out For The Preparation Of Technical Execution Projects, Including Execution Details That Correspond To The Quality Requirements Imposed By The Design And Construction Legislation In Force. The Activities That The Contractor Will Carry Out Will Include, But Will Not Be Limited To, The Following Works Presented Below: • Expansion Works Related Installations Related To Seau Deva; • Expansion Works Related Installations Related To Seau Hunedoara; As Part Of The Design And Execution Contract, The Following Categories Of Works Will Be Carried Out: Expansion Of The Natural Gas Distribution Network, Natural Gas Use Installation, Natural Gas Measurement And Regulation Point, Platform Scale, Sludge Drying Station Building, Sludge Evacuation Snek Adapter, Horizontal Conveyor, Dryer Loading Bunker, Sludge Dryer, Sludge Degassing Facility Under Vacuum From The Digester, Biofilter And Catalyst, Intermediate Conveyor, Pelletizer, Horizontal Conveyor Elevator, Sulfuric Acid Dosing Installation, Sulfuric Acid Warehouse, Compressed Air Compressor, Silo With Scales, Steam Boiler, Internal And External Electrical Networks, Scada Monitoring And Automation System, Fire Extinguishing Networks, Water Supply And Sewerage, Tank And Installation For Raising Fire Pressure, Sludge Collection Bunker, Equipped With Chopper And Shredder, Modernization Of Grates, Flow Meter Installation, Other Works, Including The Procurement Of Equipment Necessary For The Operation Of Treatment Plants.
|