Underground Work Other Than Tunnels, Shafts And Subways – Transport Systems. 375 Tons Dispose Of Temporarily Stored Soil, Z0 375 Tons Dispose Of Temporarily Stored Soil, Z1.1 100 Tons Dispose Of Temporarily Stored Soil, Z2 2,200 M2 Create Planum 1,275 M3 Loosen Soil And Temporarily Store 550 M3 Reinstall Stored Soil 900 M3 Produce Fss 1,050 M2 Take Up Asphalt Paving 1,850 M2 Produce Asphalt Base Layer And Asphalt Surface Layer Produce 60 M Curb And 3-Row Gutter Produce 95 M Amphibious Guidance System In Addition, The Best. Corrugated Steel Culvert To Be Extended On Both Sides In Accordance With The Road Widening.
Contact Information
Address
Rummelsberg 71
Contact No.
000
Email
vergabestelle@sppm.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113020703
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.