Engineering Services – Planning A Process Water Management System. Infra-Zeitz Servicegesellschaft Gmbh Operates The 232 Hectare Zeitz Chemical And Industrial Park (Cipz) In Alttröglitz. Infra-Zeitz Supplies, Among Other Things, The Local Companies With Process And Cooling Water As Well As Fully Desalinated Water. A Long-Term Goal Of Infra-Zeitz Is To Reduce The Consumption Of Fresh Water From The White Elster. For This Purpose, The Implementation Of A Process Water Management System Is Planned. As Part Of The Project, It Is Planned To Process Process Water In The Waterworks On The White Elster Into Process Water. The Planning And Construction Of Appropriate Infrastructure Is Required To Transport The Process Water. The Following Measures Must Be Planned: - Approx. 200 M Gravity Pipeline - Approx. 1,300 M Pressure Pipeline - Pumping Station With Redundant Pumps And With Emergency Overflow. In Addition, The Implementation Of Appropriate Measurement, Control And Regulation Technology Is Planned To Monitor The Quality Of The Process Water And Transmit It To The Cipz Control Room. For This Purpose, Sensors Are Installed To Measure Conductivity, Ph Value And Turbidity. The Flow Should Be Determined Using A Magnetic Inductive Flow Meter (Mid). The Pipes And The Pumping Station Must Be Dimensioned So That They Can Absorb An Average Amount Of Process Water Of 38 M3/H. The Processing Area Includes Areas Suspected Of Being Explosive Ordnance. In Addition, The Interests Of Deutsche Bahn Ag Must Be Taken Into Account And Appropriate Coordination Must Be Carried Out, As Crossing A Railway Line Is Necessary. As Part Of This Tender, The Necessary Planning Services For The Process Water Management System Will Now Be Awarded. The Service Phases (Lph) 1-3 For The Service Profiles Of Engineering Structures (§§ 41 Ff. Hoai 2021) And Technical Equipment (§§ 53 Ff. Hoai 2021) Are Advertised With Optional Commissioning Of Lph 5-7 And Lph 8-9. The Commission And Project Start Are Scheduled For September 2026. After Completing Lph 3, The Application For Funding Is Planned. Accordingly, A Period Of Six Months Must Be Taken Into Account Until The Start Of Lph 5. The Lph 4 Is Not Advertised And Awarded. In The Preliminary Planning, A Planning Concept Must Be Created Which Considers Possible Variants For The Construction Of The Line, The Route And Also The Crossing Of The Railway Line, Taking Into Account The Requirements Of Deutsche Bahn. On This Basis, An Approvable Planning Concept Must Be Drawn Up In The Draft Planning, Which Includes All Subject-Specific Requirements. The Eligible Costs Amount To 1,059,050.00 Euros And Represent The Basis For The Fee Calculation. In Addition, Further Special Services From The Advertised Service Profiles Should Be Commissioned: - Development Of A Task For An Existing Survey, - Development Of A Task For Subsoil Investigations,
Contact Information
Address
Haupstraße 30
Contact No.
03441 842528
Email
ch.voigt@infra-zeitz.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113020571
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.